My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08463
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:39 PM
Creation date
10/5/2006 3:38:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Las Animas and Vicinity
Stream Name
Arkansas River
Basin
Arkansas
Title
Arkansas River and Tributaries, Las Animas, Colorado, and Vicinity
Date
2/18/1964
Prepared For
CWCB
Prepared By
COE
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />downstream from the dam. This lake, known as Lake Hasty, has a surface <br />area of approximately 75 acres and a maximum depth of 12 feet. It has <br />proved very popular for sport fishing since the fishery resources of <br />the Arkansas River are inadequate to meet the local demand. <br /> <br />. <br /> <br />26. Other improvements constructed by the Corps of Engineers in <br />the Arkansas River Bas i n i ncl ude the Temp leton Gap F loodway at Co lorado <br />Springs, the Pueblo F loodway l.evee Exterslon at Pueblo, and the Pinon <br />Canyon Dam at Trinidad. AI I of these improvements were constructed as <br />single-purpose flood control projects. ,The Templeton Gap Floodway <br />protects an urban area in the northeast section of Colorado Springs <br />from runoff which originates on a bowl-shaped drainage area of about <br />8 square miles and concentrates in the main channel of Templeton Gap <br />where the rapid fal I produces high velocities. The floodway, which <br />was completed in 1948, Intercepts and diverts these flows via a paved <br />channel to Monument Creek, a tributary ,to Fountain Creek. The Pueblo <br />Floodway Levee Extension is an addition to the lower end of the Pueblo <br />Floodway which was constructed by local interests on the Arkansas River <br />through the city of Pueblo shortly after the disastrous flood of, 1921. <br />The purpose of the extension is to prevent inundation of an urban area <br />of important i ndustr ia I and transportat ion fac I I It ies by backwater from <br />floods on the Arkansas River. The Pifton Canyon Dam, which was completed <br />In 1954, protects a high I Y deve loped urban area of about 40 acres in the <br />northwestern and central sections of Trinidad from floods originating' <br />on the precipitous Pifton Canyon Arroyo which drains a watershed area <br />of about 1.4 square mi les. The projec:t consists of an earth dam which <br />creates a reservoir with a storage capacity of 406 acre-feet. <br /> <br />27. In addition to the above~de~cribed major improvements, the <br />Corps of Engineers has constructed 22 emergency flood control projects <br />In the Arkansas River Basin in Colorado, as authorized under special <br />continuing authorlties(I). These consist of snagging and channel <br />clearing, emergency bank protection, emergency repairs to existing <br />flood control works, and flood fighting operations. Most of the work <br />has been done in or near cities and t9wns, including Las Animas. Fed- <br />eral costs have varied from about $4,900 to about $75,000. Emergency <br />work performed at Las Animas is descr'ibed briefly in the following <br />paragraphs and the locations are shown on plate 2. <br /> <br />28. Emergency channel repairs to protect U.S. Highway 50 bridge <br />which crosses the Arkansas River immediately north of the city were <br />comp leted by the Corps of Eng i neers J:n 1950. Th i s work, author i zed <br />In accordance with Section 12 of the '1944 Flood Control Act, consisted <br />of stab! Ilzing about 120 feet of riveir bank adjacent to the north <br />abutment of the bridge. The cost to'the Federal Government was $7,500. <br /> <br />I <br /> <br />(I) Special continuing authorities are those items of legislation <br />pertaining to urgently needed flood ~ontrol work wherein the authority <br />and responsibi lity for the selection and funding are dalegated to the <br />Secretary of the Army and the Ch i et of Eng i neers. <br /> <br />. <br /> <br />10' <br />
The URL can be used to link to this page
Your browser does not support the video tag.