Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br /> <br />STREAM NAME <br /> <br />South Platte River <br /> <br />Toll Gate Creek <br /> <br />Toll Gate Creek <br /> <br />TRI-LAKES WATER CONTROL MANUAL <br />HYDRAULICSTRUCTURES~NTORY <br />PLANNED IMPROVEMENTS <br />(CONTINUED) <br /> <br />IMPROVEMENT <br />DESCRIPTION <br /> <br />Upper Central Platte Valley <br />Project: Improvements consist <br />of channel deepening, channel <br />widening, and lowering of faber-dam <br />at the Zuni Power Plant. <br />Construction planned for 1999 :t <br /> <br />IMPROVEMENT <br />LOCATION <br /> <br />1-25 to 8th Avenue <br /> <br />Grade control project consisting of <br />several drop structures. <br />Construction planned for 1995/96 <br /> <br />Chambers Road to <br />Alameda Avenue <br /> <br />Grade control project consisting of <br />five drop structures. <br />Construction planned for 1996. <br /> <br />6th Avenue to <br />Colfax Avenue <br />