My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08437
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:34 PM
Creation date
10/5/2006 3:36:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Unincorporated Jefferson County
Stream Name
Bear Creek, Cub Creek
Basin
South Platte
Title
LOMR - Affected Panel 08059C0265E - Case No. 03-08-0479P
Date
6/2/2004
Prepared For
Unincorporated Jefferson County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />Page 4 of4 <br /> <br />AN 3 0 200~ <br /> <br /> <br />LOMR-APP <br /> <br />Case No.: 03-08-0479P <br /> <br />Effective Date: <br /> <br />Issue Date: <br /> <br />, <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D,C, 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />PUBLIC NOTIFICATION OF REVISION <br /> <br />Within 90 days of the second publication in the local newspaper, a citizen may request that we reconsider this determination. Any <br />request for reconsideration must be based on scientific or technical data, Therefore, this letter will be effective only after the 90-day <br />appeal period has elapsed and we have resolved any appeals that we receive during this appeal period. Until this LOMR is effective, the <br />revised BFEs presented in this LOMR may be changed, <br /> <br />This information will he published in the Federal Register and your local newspaper as detailed below, <br /> <br />LOCAL NEWSP APER <br /> <br />Name: Evergreen Canyon Courier <br />Dates: 02/25/2004 03/03/2004 <br /> <br />PUBLIC NOTIFICATION <br /> <br />FLOODING SOURCE <br /> <br />LOCATION OF REFERENCED ELEVATION <br />Approximately 150 feet downstream of CH73 <br />AP.I:~roximately_520Jeet.up6tream.ofCH'73 <br />Approximately 90 feet downstream of CH73 <br /> <br />BFE (FEET NGVO} <br />EFFECTIVE REVISED <br />7,046 7,044 <br /> <br />7,049 7,054 <br /> <br />7,051 7,054 <br /> <br />MAP PANEL <br />NUMBER(S) <br /> <br />08059C0265.E_ _ <br /> <br />08059C0265 E <br /> <br />08059C0265 E <br /> <br />Bear Creek <br /> <br />Cub Creek <br /> <br />This detennination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If <br />you have any Questions about this document, please contact the FEMA Map Assistance Center toll free at 1~877~336~2677 (1-877~FEMA MAP) or by letter <br />addressed to the LOMR Depot, 3601 Eisenhower Avenue, Alexandria, VA 22304. Additional infonnation about the NFl? is available on our website at <br />htto:/lwww.fema,oovlnfio. <br /> <br /> <br /> <br />Doug Bellomo, P,E" CFM, Acting Chief <br />Hazaro Identification Section <br />Mitigation Oivision <br />Emer enc Pre arednes$ and Res nse Directorate <br /> <br />100803 01.0A03080479 1021AC <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.