Laserfiche WebLink
<br />TOTAL IMPROVEMENT COSTS - SHEET 6 <br />Item <br />TOTAL CONSTRUCTION COSTS <br />Annual Operation and Maintenance Costs <br />Present Worth Operation and Maintenance Costs <br /> <br />Cost <br />$ 0 <br />$ (580) <br />$ 8,400 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />COMMENTARY - SHEET 6 <br /> <br />The flow from a 100-year storm would pass over the roadway at the Kipling Street <br />crossing under present conditons. However, a double 8 foot by 14 foot box culvert was <br />under construction at the writing of this report, which should adequately conduct the 100- <br />year flood beneath Kipling Street. <br />No channel improvements are justified, since the channel remains predominantly in <br />a natural state, and no major flood damage potential exists. Debris, including trash, <br />uprooted vegetation, and other material should be removed regularly during the flood <br />season. Floodplain use should continue to be monitored and regulated as development <br />occurs to ensure that floodplain activities are compatible with the City of Arvada long <br />range land use plans. <br /> <br />TOTAL IMPROVEMENT COSTS <br /> <br />$ 8,400 <br />