My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08407
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:03 AM
Creation date
10/5/2006 3:35:53 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Adams
Community
Arvada, Westminster
Stream Name
Little Dry Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
4/1/1979
Prepared For
Jefferson County / Adams County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COMMENTARY - SHEET 4 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The channel is cut off in several places by stock watering ponds and at Church <br />Ditch, and is bordered by numerous small and medium sized riprarian trees in this area. A <br />flow separation structure is proposed for Church Ditch to ensure that the ditch is not <br />overburdened with storm runoff, Because the 100-year flood damage potential is small, no <br />other channel improvements are recommended for this channel reach. Floodplain use <br />should continue to be monitored and regulated as development occurs to ensure the <br />floodplain activities are compatible with Jefferson County and Arvada long range land use <br />plans. Debris, including trash, uprooted vegetation, and other material should be removed <br />regularly duri'lt the flood season. <br /> <br />TOTAL IMPROVEMENT COSTS - SHEET 4 <br /> <br />Item Cost <br />Channel Improvements $ 15,300 <br />Street Improvements $ 0 <br />Utility Relocation $ 0 <br />SUb-Total $ 15,300 <br />Contingencies (25% of Sub-Total) $ 3,800 <br />TOTAL CONSTRUCTION COSTS $ 19,100 <br />Right-of-Way Acquisition $ 0 <br />Annual Operation and Maintenance Costs - <br />Arvada $ (340) <br />Jefferson County $ (220) <br />Present Worth Operation and Maintenance Costs $ 8,100 <br />TOTAL IMPROVEMENT COSTS $ 27,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.