Laserfiche WebLink
<br />, , <br /> <br />Attachment 2 <br /> <br />CONTRACTOR'S Qll/\LIF'ICATIONS AND EQUIPMENT SCHEDULE <br /> <br />. <br /> <br />GROUND CONTROL SURVEY <br /> <br />Will work be sub-contracted? No <br />If so, give the firm's name and address:, <br /> <br />, , <br /> <br />Type of Survey Equipment Used for: <br /> <br />'" See attachment 2-a (I) for inventory <br /> <br />Leveling (2) Nikon Model AE automatic <br />Anqles 0 (2) Wild T-2 one second theodolite <br />Distance Measurment (2) Hewlett Packard 3800 Distance Meter <br /> <br />Date of last <br />Calibration <br /> <br />Feb. 1976 <br />Nov. 1975 <br />Dec. 1975 <br /> <br />Person in Charge of Survey Richard A. Gossett'" See attachment 2-1 (2) <br /> <br />Years of Experience <br /> <br />15 years <br /> <br />Briefly aive firm's experience in laying out and surveying <br />ground control f.or aerial, photo ~roiects of this type. <br />.. <br /> <br />Bell has been engaged in panel layout and survey control for aerial mapping <br />for approximately 10 years. Until June 1973 this work had been performed under a <br />sub-contract basis for various aerial mapping companies. In June 1973 Bell was able <br />to offer total mapping services such as flood plane mapping for Colorado Water' <br />Conservation Board, flood plane mapping ,for Urban Drainage & Flood' Control District, <br />mapping for Regional Transportation District route planning, mapping for consulting <br />engineers for utility planning and design, snd mapping for cities for planning or <br />development. " <br />'" See attachment 2-s (3) for client references. <br /> <br />IL'[ <br /> <br />00' <br /> <br />~. <br /> <br />".1.' <br />. <br /> <br />. ."~' . <br /> <br />., <br /> <br />" <br /> <br />-7- <br /> <br />, , <br /> <br />o. <br />