My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08401
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:28 PM
Creation date
10/5/2006 3:35:51 AM
Metadata
Fields
Template:
Floodplain Documents
County
San Juan
Community
Silverton
Stream Name
Animas River
Basin
San Juan/Dolores
Title
Photogrammetric Mapping Proposal Animas River Floodplain
Date
5/14/1976
Prepared For
CWCB
Prepared By
Bell Mapping Company
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Item <br /> <br />Articles of Services <br /> <br />Cost <br /> <br /> <br />.. <br /> <br />~ <br /> <br />Attachment 3 <br /> <br />PERFORMANCE ITEMS <br /> <br />The following 'schedule shall be submitted to the Colorado <br />Water Conservation Board (CWCB) by the contractor. No proposals <br />for photogranunetr ic services wi 11 be considered that do not quote <br />prices on all individual items within the schedule. These cost <br />quotations shall be considered as the contractor's final commitment <br />for performance of work. This schedule shall be attached .to the <br />contract of Ule successful contractor. <br /> <br />Items mi'lrked with an asterisk shall be submitted to the <br />CWCB for reVlew and approval prior to the contractor's proceeding <br />with the next phi'lseof the project. The cost for each numbered <br />item shall be provided in the space alloted. <br /> <br />SCHEDULE <br /> <br />1.* The proposed flight plan, including: <br /> <br />A. Approximate date and time of day project <br />will be flown. 2 Weeks after notice to proceed. <br /> <br />B. Flight height (above mean ground <br />elevation). 3000' A.S.1. <br /> <br />C. Map showing ground control layout and <br />flight lines. Enclosed attachment 4-1 <br /> <br />D. Location of permanent monuments shall <br />also be shown on the above map. <br /> <br />E. <br /> <br />1nc1llclo in this item the cost of flying <br />Clnd photc"-Jrarily. <br /> <br />.$ <br /> <br />550.00 <br /> <br />2 . <br /> <br />Set _~~.__ permunent monuments (see <br />Specifications Section) for vertical and <br />horizontul control. Monument,s shall be <br />paneled prior to aerial photography. <br /> <br />$ <br /> <br />750.00 <br /> <br />...,11- <br /> <br />I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.