Laserfiche WebLink
<br />. <br /> <br />{ <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />f <br /> <br />. <br /> <br />Ie <br /> <br />Ie <br /> <br />I <br /> <br />Ie <br /> <br />e <br /> <br />( <br /> <br />. <br /> <br />SWDED-XW <br />SUBJECT: <br /> <br />(SWAED-P 21 Oct 77) 1st Ind <br />Fountain Dam and Reservoir, <br />Hemorandum No.1, Hydrology <br /> <br />. 1 HEe 7T <br />Fountain Creek, <br />- Part 1 <br /> <br />Colorado, Design <br /> <br />6. Appendix B, La Junta Local Protection Project, para 7. Procedures <br />used to adjust discharges for the operation of Pueblo Reservoir to re- <br />flect present conditions should be discussed. <br /> <br />FOR THE DIVISION ENGINEER: <br /> <br />. <br /> <br />1 Ine! <br />Dupe cy incl wd <br /> <br />&"1.~L... /.(.. ./ <br />~~~~ILL, P.E. <br />Chief, Engineering Division <br /> <br />3 <br />