Laserfiche WebLink
<br />. <br /> <br /> <br />DEPARTMENT OF THE ARMY <br />ALBUQUERQUE DISTRICT. CORPS OF ENGINEERS <br />P. O. BOX t5BO <br />ALBUQUERQUE. NEW MEXICO 87t03 <br /> <br />. <br /> <br />SWAED-P <br /> <br />2l October 1977 <br /> <br />SUBJECT: Fountain Dam and Reservoir, Fountain Creek, Colorado, Design <br />Nemorandum No.1, Hydrology - Part 1 <br /> <br />. <br /> <br />Division Engineer, Southwestern <br />ATTH: S\mED-X <br /> <br />. <br /> <br />- <br /> <br />_. Transmitted for review and approval is a draft of "F01mtain Dam <br />and Reservoir, Fountain Creek, Colorado, Design Memorandum No.1, <br />Hydrology - Part 1." Basic hydrologic criteria contained in the subject <br />report have teen discussed and coordinated by telephone conversation <br />with s,m personnel. Subjects discussed included standard project and <br />probable nBxi~um precipitation, flood routing procedures, and discharge <br />fre~uency curves. <br /> <br />'. <br /> <br />2. Appendix B of the subject report was previously submitted and approved <br />for use in the Special Flood Hazard Report at La Junta, Colorado. The <br />additional information re~uested in the approval letter ffivAED-P, dated <br />8 July 1977, 1st indorsement has been incorporated in the report. Also, <br />the discharge frequency cUrve for Fountain Creek at Pueblo contained in <br />the main report was approved by letter SWAED-P, dated 10 llay 1977, 3d <br />indorsement. <br /> <br />'. <br /> <br />I- <br />, <br />, <br /> <br />FOR T}~ DISTRICT ENGINEER: <br /> <br />!- <br /> <br />1 Incl (dupe) <br />as <br /> <br /> <br />c:----tr- tJ ~"P- <br />JASPER H. COO~illES, P.E. <br />Chief, Engineering Division <br /> <br />. <br /> <br />- <br /> <br />c <br /> <br />- <br />