Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />01/04/2000 18:00 <br /> <br />PAGE 05/05 <br /> <br />402-221-4890 <br /> <br />CORPS OF ENGINEERS <br /> <br />. <br /> <br />DRAFT <br />4 <br /> <br />Selectee Criteria <br /> <br />1. The selectee must be familiar with relevant documents such as HMR 51, HMR 52, <br /> <br />HMR 5?A, WMO 332, <br /> <br />2, The selectee must have professional experience dealing with the preparation of <br /> <br />and/or review ofPMP reports. studies. or manuals, <br /> <br />3, <br /> <br />The selectee must have no previous involvement with any part of the July 1995 <br />site-specific study for the Cherry Creek Watershed, <br /> <br />4, The selectee should not have formed any opinions about or formulated judgments <br />concerning the Study prior to selection, <br /> <br />Deliverables <br /> <br />The written review of tile Study shall be completed and delivered to the selector within 3 <br /> <br />months following award of the contract. If a' potential selectee cannot provide the review within <br /> <br />this time frame, the selectee should indicate a date upon which the review can be completed and <br />delivered to the selector. <br />