My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08366
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:33:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Contacts and Meetings
Date
4/21/1972
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. , <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />~~7(3~3~3~:6~~1 Meeting Announcement <br />Cherry Creek Dam Safety Study - Technical Meeting #5 <br /> <br />a <br /> <br />Bill Owens <br />Governor <br /> <br />To: <br /> <br />Members and Invited Members of the Technical Review Team <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />From: <br /> <br />Larry Lang, Project Director, CWCB <br /> <br />Peter H. Evans <br />eWeB Director <br /> <br />Subject: <br /> <br />Agenda for Technical Meeting #5 <br /> <br />Logistics: <br /> <br />Date: <br />Location: <br />Address: <br /> <br />Dan McAuliffe <br />March 15, 2000 from 1:00 pm to 2:30 p.m, Deputy Directoc <br />Urban Drainage and Flood Control District, conference room <br />2480 W. 26th A venue, Suite 156B <br />Diamond Hill Office Complex, phone (303) 455-6277 <br />Street parking, or use west lot across from UDFCD office (please place a <br />note in your front windshield indicating that you are at an official meeting at <br />UDFCD, or see the receptionist for a parking tag) <br /> <br />Parking: <br /> <br />Agenda: <br /> <br />1. Welcome and Introductions <br /> <br />2, Review draft meeting minutes from the January 5, 2000 meeting, <br /> <br />3, Introduce the CWCB's study contractor selected for preparation of the draft Scope of Work for independent <br />PMP analysis (Cheryl Signs Engineering) <br /> <br />4, Recap of the Greenwood Village and CWCB discussions with the Congressional offices of Rep, Hefley and <br />Rep, Tancredo regarding the Corps' Dam Safety Study of Cherry Creek <br /> <br />5, Brief Cheryl Signs Engineering regarding community and individual concerns with the NWS and Corps' July <br />13, 1995 site-specific PMP study, <br /> <br />6, Presentation of the draft CWCB work plan for Cheryl Signs, <br /> <br />7, Consideration of additional study tasks in the CWCB work plan, <br /> <br />8, Discussion regarding the status of the Corps of Engineers position on a joint technical review of the previous <br />1995 NWS PMP study, <br /> <br />9, Other discussion items as necessary <br /> <br />cc: <br /> <br />Peter Evans, Director, CWCB <br />Hal Simpson, State Engineer, DWR <br /> <br />c:\seca\projects\cherry creek\agenda 3,15,QQ,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.