My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08366
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:33:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Contacts and Meetings
Date
4/21/1972
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.\ <br /> <br />" <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866,3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Cherry Creek Dam Safety Advisory Committee <br />Pre-Final Cherry Creek PMP Study Meeting Summary <br />At the Urban Drainage & Flood Control District Office <br />April 2, 2003 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Attendees: <br />Brian Schat- Denver Public Works Bob McGregor- Water & Waste Engineering, Inc, <br />Doug Trieste - Flow Technologies Ed Tomlinson - Applied Weather Assoc, <br />Gary Lewis, Parsons Engineering Jack Byers, State Engineer's Office <br />Jeanette Alberg - Senator AlIard's Office Joe Busto - CWCB <br />John Henz - HDR Engineering, Inc, John Liou, FEMA Region VIII <br />Larry Lang - CWCB Lou Schreiner - Bureau of Reclamation <br />Ross Williams - Applied Weather Assoc, Sandy Rayl- USACE Colorado Service Office <br />Rod Kuharich - CWCB Director Steve Spann - Spann Energy <br />Terry Baus - City & County of Denver William Badini, HDR Engineering, Inc, <br />William D, Miller - USACE - Omaha Dist. <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />The Cherry Creek Probable Maximum Precipitation Study contractor is Ed Tomlinson, Applied Weather <br />Associates, Inc. of Monument, Colorado. <br /> <br />Handonts: <br />Final presentation slides, Ed Tomlinson, A W A <br />Final presentation slides, John Henz's, HDR presentation <br />Dr, Bob Jarrett's, "Paleoflood Investigations for the Cherry creek basin, Eastern Colorado" <br />Display copy of the Draft Final Report entitled, "Site Specific Probable Maximum Precipitation Study for the <br />Cherry Creek Basin", <br /> <br />Technical Review Panel: <br />Nolan Doesken Colorado Climate Center <br />Lou Schreiner Bureau of Reclamation <br />Gary Lewis Parsons Engineering Services <br /> <br />Meeting Overview: <br />This meeting was to present the pre, final findings from the study to the Advisory Committee, legislative <br />interests and the Technical Review Panel. Larry Lang welcomed everyone to the meeting; went over agenda <br />for the meeting; apologized for cancellations over the past few months; pointed out the handouts from A W A <br />and CWCB. Ed Tomlinson presented the study results in a PowerPoint slide presentation, John Henz ofHDR <br />Engineering followed and presented additional study results, The final presentation was one PowerPoint slide <br />summarizing Bob Jarrett's study "Paleo-flood Investigation for the cherry Creek basin, Eastern Colorado" <br />from 2000, Technical review comments were submitted and discussed by Gary Lewis, Parsons Engineering; <br />Lou Schreiner, BOR; and Nolan Doesken, Colorado Climate Center, Final technical review comments by the <br />Technical Review Panel Members, the Advisory Committee and the National Weather Service have a May <br />15,2003 deadline, The Final comments and responses to the final comments will be included in the final <br />report, <br /> <br />After lunch there was approximately two and a half hours of discussion about the A W A PMP Study results, <br />reviewing the A W A Site-Specific PMP Study, and the Corps Cherry Creek Lake Project Operations and <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.