<br />.,
<br />
<br />STATE OF COLORADC
<br />
<br />Colorado Water Conservation Board
<br />
<br />Department of Natural Resources
<br />
<br />1313 Sherman Street, Room 721
<br />Denver, Colorado 80203
<br />Phone: (303) 866-3441
<br />FAX: (303) 866,4474
<br />
<br />www.cwcb.state.co.us
<br />
<br />
<br />Cherry Creek Reservoir
<br />Site Specific Probable Maximum Precipitation Study
<br />Minutes from the Meeting
<br />Denver Urban Drainage and Flood Control District Office
<br />May 8,2002 at 12:30 - 4:00 p.m,
<br />
<br />Bill Owens
<br />Governor
<br />
<br />Greg E, Walcher
<br />Executive Director
<br />
<br />Rod Kuharich
<br />CWCB Director
<br />
<br />Attachments
<br />. Henz discussion of storms
<br />. National Weather Service - transmittal letter and review comments received May 10, 2002
<br />. Probable Maximum Flood (pMF) and the Probable Maximum Precipitation (pM!') paper,
<br />
<br />Dan McAuliffe
<br />Deputy Director
<br />
<br />Reminders
<br />The final project meeting is at Urban Drainage and Flood Control District Offices from 12:00 - 4:00 p,m. in the board room
<br />at 2480 West 26th Avenue, Suite 156-B, Denver, CO 80211, voice: 303,455,6277 fax: 303,455-7880, National Weather
<br />Service Geoffrey Bonnin has committed to attend,
<br />
<br />Those in Attendance
<br />Dr. Ed Tomlinson - Applied Weather Associates
<br />Mr. Ross Williams - Applied Weather Associates
<br />Mr. Doug Trieste - Flow Technologies
<br />Mr. John Henz ~ HDR Engineering
<br />Mr. Larry Lang - Colorado Water Conservation Board
<br />Mr. Joe Busto - Colorado Water Conservation Board
<br />Mr. LoUSchreiner- United States Bureau of Reclamation
<br />Mr. Nolan Doesken - Colorado Climate Center I CSU
<br />Mr. Gary Lewis ~ Parsons Engineering
<br />Mr. Van Shipley- United States Anny Corp of Engineers
<br />Mr. Kevin Wegener - City of Aurora, Colorado
<br />
<br />Mr. Mike White - United States Anny Corps of Engineers
<br />Mr. William Dale Miller - United States Anny Corp of Engineers
<br />Mr. Bob McGregor- Greenwood Village Water and Waste
<br />Engineering
<br />Mr. Doug Morris - Greenwood Village City Council
<br />Mr. Ben Urbonas - Urban Drainage and Flood Control District
<br />Mr. Terry Baus - City and County of Denver, Colorado
<br />Mr. Alan Pearson - Colorado Dam Safety
<br />Ms. Brooke Fox - Douglas County Consultant
<br />
<br />Introductions bv Mr, Larry Lang
<br />. Mr, Lang welcomed everyone to the meeting, including the Technical Review Committee (TRC) and Ms, Brooke Fox
<br />who was there to represent Douglas County, one of the sponsors of the PM!' study,
<br />. Mr, Lang stated that the National Weather Service (NWS) was now an official part of the study as a reviewer, Their
<br />representative, Mr, Geoffrey Bonnin will attend the last meeting on July 2, 2002 at Urban Drainage from 12:00,4:00, MJ
<br />Lang also mentioned that U,S, Representatives Joel Heffley and Tom Tancredo are also keeping track of the progress of
<br />the PMP project, as well as Mr, Mike White of the Northwest Division of the Army Corps of Engineers (USACE),
<br />. Mr, Lang stated that Interim Report # I is in the hands of the NWS, but as of this meeting, the review comments had not
<br />been received, At this point, Mr, Lang went over the meeting agenda, which included the following:
<br />. Dr, Ed Tomlinson would be presenting preliminary fmdings for Interim Report #2,
<br />. Interim Report #2 will be available to the TRC by May 17, 2002, and copies will be made for anyone else who requests
<br />one,
<br />. Dr, Tomlinson will discuss the fmal report outline, and the fmal report will be presented at the meeting on July 2, 2002,
<br />. A news release may be put out at that time, but we are not planning a public hearing, but we will be inviting all those
<br />directly involved with the study,
<br />
<br />Flood Protection . Water Supply Planning and Finance. Stream and Lake Protection
<br />Water Supply Protection. Conservation and Drought Planning
<br />
|