Laserfiche WebLink
<br />., <br /> <br />STATE OF COLORADC <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866,4474 <br /> <br />www.cwcb.state.co.us <br /> <br /> <br />Cherry Creek Reservoir <br />Site Specific Probable Maximum Precipitation Study <br />Minutes from the Meeting <br />Denver Urban Drainage and Flood Control District Office <br />May 8,2002 at 12:30 - 4:00 p.m, <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E, Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Attachments <br />. Henz discussion of storms <br />. National Weather Service - transmittal letter and review comments received May 10, 2002 <br />. Probable Maximum Flood (pMF) and the Probable Maximum Precipitation (pM!') paper, <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Reminders <br />The final project meeting is at Urban Drainage and Flood Control District Offices from 12:00 - 4:00 p,m. in the board room <br />at 2480 West 26th Avenue, Suite 156-B, Denver, CO 80211, voice: 303,455,6277 fax: 303,455-7880, National Weather <br />Service Geoffrey Bonnin has committed to attend, <br /> <br />Those in Attendance <br />Dr. Ed Tomlinson - Applied Weather Associates <br />Mr. Ross Williams - Applied Weather Associates <br />Mr. Doug Trieste - Flow Technologies <br />Mr. John Henz ~ HDR Engineering <br />Mr. Larry Lang - Colorado Water Conservation Board <br />Mr. Joe Busto - Colorado Water Conservation Board <br />Mr. LoUSchreiner- United States Bureau of Reclamation <br />Mr. Nolan Doesken - Colorado Climate Center I CSU <br />Mr. Gary Lewis ~ Parsons Engineering <br />Mr. Van Shipley- United States Anny Corp of Engineers <br />Mr. Kevin Wegener - City of Aurora, Colorado <br /> <br />Mr. Mike White - United States Anny Corps of Engineers <br />Mr. William Dale Miller - United States Anny Corp of Engineers <br />Mr. Bob McGregor- Greenwood Village Water and Waste <br />Engineering <br />Mr. Doug Morris - Greenwood Village City Council <br />Mr. Ben Urbonas - Urban Drainage and Flood Control District <br />Mr. Terry Baus - City and County of Denver, Colorado <br />Mr. Alan Pearson - Colorado Dam Safety <br />Ms. Brooke Fox - Douglas County Consultant <br /> <br />Introductions bv Mr, Larry Lang <br />. Mr, Lang welcomed everyone to the meeting, including the Technical Review Committee (TRC) and Ms, Brooke Fox <br />who was there to represent Douglas County, one of the sponsors of the PM!' study, <br />. Mr, Lang stated that the National Weather Service (NWS) was now an official part of the study as a reviewer, Their <br />representative, Mr, Geoffrey Bonnin will attend the last meeting on July 2, 2002 at Urban Drainage from 12:00,4:00, MJ <br />Lang also mentioned that U,S, Representatives Joel Heffley and Tom Tancredo are also keeping track of the progress of <br />the PMP project, as well as Mr, Mike White of the Northwest Division of the Army Corps of Engineers (USACE), <br />. Mr, Lang stated that Interim Report # I is in the hands of the NWS, but as of this meeting, the review comments had not <br />been received, At this point, Mr, Lang went over the meeting agenda, which included the following: <br />. Dr, Ed Tomlinson would be presenting preliminary fmdings for Interim Report #2, <br />. Interim Report #2 will be available to the TRC by May 17, 2002, and copies will be made for anyone else who requests <br />one, <br />. Dr, Tomlinson will discuss the fmal report outline, and the fmal report will be presented at the meeting on July 2, 2002, <br />. A news release may be put out at that time, but we are not planning a public hearing, but we will be inviting all those <br />directly involved with the study, <br /> <br />Flood Protection . Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />