My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08366
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:33:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Contacts and Meetings
Date
4/21/1972
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866,3441 <br />FAX: (303) 8664474 <br />WWW.cwcb.state.CO.llS <br /> <br />TO: <br />FROM: <br /> <br />DATE: <br />RE: <br /> <br />II~';"CONS' <br />" "" <br />" '" <br />~ .. <br />0;. Ie <br />~ ,~ <br />. '/ <br />'./9111. <br /> <br />Cherry Creek PMP Study Group / Interested parties <br />Larry Lang, CWCB Project Manager <br />Joe Busto, CWCB Flood Protection Section <br />May 28, 2003 <br />Final Report Presentation and Final Meeting <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />eWeB Director <br /> <br />The final proiect meetinl! for the Cherrv Creek PMP Studv has been scheduled Dan McAuliffe <br />at UDFCD board room for Thursdav. June 19. 2003 from 9:00 AM _ 12:30 PM Deputy Director <br />If you have questions call Larry Lang at (303) 866,3989 or Joe Busto at (303) 866,4807, We look <br />forward to seeing you there as we close this project out. <br /> <br />Urban Drainage and Flood Control District <br />2480 West 26th Avenue, Suite 156,8 <br />Denver, CO 80211 <br />phone: 303-455-6277 fax: 303-455,7880 <br /> <br />9:00 AM <br /> <br />9:15AM <br /> <br />10:00AM <br /> <br />10:30 AM <br /> <br />I \:00 AM <br /> <br />11:15 AM <br /> <br />Cherry Creek PMP Study Agenda <br />Welcome and Introductions <br /> <br />Presentation on the Cherry Creek Reservoir PMP technical review <br />Applied Weather Associates - Ed Tomlinson and HDR Engineering, John Henz <br /> <br />Cherry Creek Reservoir PMP technical review presentation <br />National Weather Service, <br />U ,S, Army Corps of Engineers <br /> <br />Technical Review Panel's final comments <br />CWCB Technical Review Panel <br />. Lou Schreiner - US Bureau of Reclamation <br />. Nolan Doesken - CSU Colorado Climate Center <br />. Gary Lewis - Parsons Engineering Science <br /> <br />Advisory Committee and sponsoring communities project overview <br />. Douglas County <br />. Arapahoe County <br />. City of Greenwood Village <br />. City of Aurora <br /> <br />Open Discussion / Round table <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. ConSClVation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.