My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08290
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:10 PM
Creation date
10/5/2006 3:31:19 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
South Platte
Basin
South Platte
Title
Contract Documents and Specifications Eastern Flow Path Drainageway Improvements, Milliken
Date
12/1/1983
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE OF CONTENTS (continued) <br /> <br />SECTION 8.00 STRUCTURAL CONCRETE <br /> <br />8,01 <br />8.02 <br /> <br />GENERAL , <br />MATERIALS <br /> <br />8.03 <br /> <br />8.02.1 <br />8,02,2 <br />8.02.3 <br />8,02,4 <br />8,02.5 <br />8.02.6 <br /> <br />JOB-MIXED CONCRETE <br />READY-MIXED CONCRETE <br />CONSISTENCY . , . . . <br />RETEMPERING or' CONCRETE <br />EXPANSION JOINT MATERIAL <br />FORMS . <br /> <br />PLACING CONCRETE <br /> <br />8.04 <br /> <br />8.03.1 <br />8.03,2 <br />8,03.3 <br />8,03.4 <br />8.03.5 <br />8.03,6 <br />8,03.7 <br />8.03.8 <br />8,03.9 <br />8.03.10 <br />8.03.11 <br />8.03.12 <br />8.03.13 <br />8,03.14 <br /> <br />GENERAL <br />SUBGRADE PREPARATION <br />CONNECTIONS AND REPAIRS TO EXISTING CONCRETE <br /> <br />FORMS . . . . . . . . . <br />PLACEMENT . . . , , . . <br />COLD WEATHER CONCRETING <br />HOT WEATHER CONCRETING <br />FINISHING CONCRETE <br />JOINTS <br />CURING ...., <br />MARKING ..... <br />DEFACED OR DAMAGED CONCRETE <br />BACKFILLING AND STRUCTURE BACKFILl" Ml\TERIAL <br />--------- <br />OPENING TO TRAFFIC <br /> <br />SCHEDULING CONCRETE WORK <br /> <br />8.05 <br /> <br />8.04,1 <br />8,04.2 <br /> <br />STORM WATER INLETS <br />CURB, GUTTER AND SIDEW~LK <br /> <br />ACCEPTANCE OF WORK <br /> <br />SECTION 9.00 PIPE JACKING, TUNNELING, BORlNi~. <br /> <br />9.01 <br />9.02 <br />9.03 <br /> <br />GENERAL . . . <br />PROTECTION OF ROADBED <br />JACKING , . <br /> <br />9.03,1 <br />9.03.2 <br />9,03.3 <br />9.03.4 <br /> <br />JACKING PIT <br />JACKING FRAME <br />JACKING PROCEDURE <br />MATERIAL. . . , . <br /> <br />v <br /> <br />Page <br /> <br />XIII.11 <br />XIII,11 <br /> <br />XIII.12 <br />XIII.12 <br />XIII,12 <br />XIII.12 <br />XIII.12 <br />XIII.12 <br /> <br />XIII,13 <br /> <br />XIII.13 <br />XIII. 13 <br />XIII.13 <br />XIII.13 <br />XIII, 13 <br />XIII. 14 <br />XIII.14 <br />XIII.14 <br />XIII.14 <br />XIII.14 <br />XIII,15 <br />XIII.15 <br />XIII, 15 <br />XIII.15 <br /> <br />XIII.15 <br /> <br />XIII.16 <br />XIII.16 <br /> <br />XIII. 16 <br /> <br />XIII, 17 <br />XIII.17 <br />XIII. 17 <br /> <br />XIII.17 <br />XIII. 17 <br />XIII. 17 <br />XIII, 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.