My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08251
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:29:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Douglas
Community
Englewood, Cherry Hills Village, Greenwood Village
Stream Name
Little Dry Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
2/1/1974
Prepared For
Arapahoe County / Douglas County / Englwewood / Cherry Hills Village
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />used in the study are not given in the published reports, and in the case <br />of the Little Dry Creek study these basic criteria apparently are not <br />available. <br /> <br />Scope <br /> <br /> <br />Under the contract, the engineering work is divided into Phase A and Phase <br /> <br /> <br />B. Under Phase A, drainage problems are defined, alternate solutions <br /> <br /> <br />developed, and approximate costs given. From the information developed <br /> <br /> <br />in Phase A, the Urban Drainage and Flood Control District and the local <br /> <br /> <br />governments decided upon one of the alternate solutions for detailed treat- <br /> <br /> <br />ment in the second phase. Phase B is the drainageway improvement master <br /> <br /> <br />planning and final report. <br /> <br />The major tasks to be accomplished under the two phases of the contract <br />are as follows: <br /> <br />Phase A. Development of Alternative Plans <br /> <br />1. Hold meetings with local governments, the District, and various <br /> <br /> <br />State and Federal agencies for basic information and data gather- <br /> <br /> <br />ing, including rights-of-way, plans for development, known hazards, <br /> <br /> <br />local preferences, and pertinent ordinances. <br /> <br /> <br />2. Make hydrologic studies to determine existing and future peak run- <br /> <br /> <br />off and runoff volumes for 10, 25 and lOa-year recurrence intervals <br /> <br /> <br />at a sufficient number of points for dependable development of al- <br /> <br /> <br />ternate solutions to flooding problems. <br /> <br /> <br />3. Determine by means of backwater analysis the extent of lOa-year <br /> <br /> <br />flooding on a detailed map and estimate the damage therefrom. <br /> <br /> <br />4. Develop a number of plans with cost estimates for alleviating <br /> <br /> <br />flood hazards in the study basin. <br /> <br /> <br />5. Obtain a legal opinion of liabilities involved in each alternate <br /> <br /> <br />plan from an attorney versed in drainage law. <br /> <br /> <br />6. Present a preliminary report with recommendation on the findings, <br /> <br /> <br />and meet with local governments and the District for verbal pre- <br /> <br /> <br />sentation. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.