My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08241
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:02 PM
Creation date
10/5/2006 3:29:44 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
427
County
Lincoln
Community
Hugo
Basin
Arkansas
Title
Floodplain Information Report - Flood Insurance Rate Map - Hugo, CO
Date
4/1/1996
Designation Date
5/1/1996
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />PREFACE <br /> <br />This report is part of a program by the Colorado Water Conservation Board (CWCB) to make <br />approximate floodplain maps prepared by the Federal Emergency Management Agency (FEMA) <br />easier for local governments to use. This CWCB report provides limited engineering information <br />to support the approximate delineations on the maps, and it provides floodplain management <br />information to guide the local governments in the use of the maps. <br /> <br />The official floodplain information for the Town of Hugo is the Flood Insurance Rate Map <br />(FIRM), dated October 15, 1985. The FIRM was prepared by the Federal Insurance <br />Administration (FIA), however this federal map does not have any published information <br />accompanying it to describe either the engineering basis of the map or the manner in which the <br />town could use it for floodplain management. The initial purpose of this report, therefore, is to <br />provide the community with limited supporting information. The report includes a description <br />of a hydrologic analysis that was performed for the community as part of the CWCB's technical <br />assistance program. The hydrologic analysis is consistent with the map in this report. In <br />addition, the report gives the community some basic information about floodplain management <br />and it gives some alternatives that could be considered in formulating and implementing its <br />floodplain management objectives. <br /> <br />A second function of this report is to assure that the FIRM meets the basic technical requirements <br />for designation and approval by the CWCB. Without a report and without a hydrologic analysis, <br />a map like the FIRM for Hugo cannot qualify for CWCB designation. Colorado statutes require <br />that local governments obtain from the CWCB the designation and approval of floodplain <br />information prior to its use for regulatory purposes. This report provides a means for the FIRM <br />to meet that statutory objective. <br /> <br />The FIRM was prepared prior to the completion of a CWCB docwnent entitled "Guidelines for <br />Determining lOO-year Flood Flowsfor Approximate Floodplains" (Guidelines). That docwnent <br />provides the necessary hydrologic information in support of the IOO-year floodplain boundaries <br />identified on the FIRM. The hydrologic information contained in the Guidelines was used in <br />preparing this report and it supports the subsequent designation of the Hugo FIRM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.