My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08228
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:00 PM
Creation date
10/5/2006 3:29:11 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Boulder
Stream Name
Boulder Creek
Basin
South Platte
Title
Urban Drainage and Flood Control District
Date
3/1/1990
Prepared For
Boulder Creek
Prepared By
Goerge V. Sabol
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o' <br />, <br />, \ <br /> <br />Storm RainfalV (CSR) model. CSR model output of peak storm total <br />, <br />rainfall, te~poral distribution of rainfall in 10 minute steps, storm <br />duration and peak 10-, 30- and 60-minute intensities were calculated. <br /> <br />3. The CSR model output was compared to historical rainfall records of <br />peak point storm total, intensity values and temporal distributions. <br />Comparison of model peak point rainfall for the three storms are shown <br />in Figure 5. <br /> <br />4. The temporal distribution of the CSR model peak point rainfall was <br />then applied in a proportional manner to each 0.5 inch of isopluvial <br />band in the historical rainfall surveys to obtain the temporal rain- <br />fall within each of the subbasins. Since each convective storm sur- <br />veyed covered a relatively large area, more than one CSR model run was <br />needed to cover each storm profile. <br /> <br />. -.y-'_I./ <br />\"- r,:, ~ _.\u-- ,. <br />B. \ transposition of the historic storm events over the Boulder Creek <br /> <br />watershed. <br /> <br />I. A prime consideration in the dynamic transposition of a storm event <br />over a watershed is the relationship between the winds in the sub- <br />cloud and cloud layers. The winds in the sub-cloud layer provide the <br />source of moist energy for the storm's growth. These winds establish <br />the location of the updraft within the storm. The cloud layer winds <br />strongly influence the general direction of movement of the storm. <br />~_.-___ ____~ !," .s, ....., <br />The vector:difference'of the two winds establishes the propogation or <br />", ~, <br />general movement pattern of raincells within the storm complex. In <br />essense this vector establishes the axis of ellipticity of the rain- <br />fall field. <br /> <br /> cloud <br />., tion. <br />\ basiIJ <br />I <br /> \ <br /> <br />2. Using the upper air temperature, moisture and wind field observations <br />for the storm event used in the reconstitution, the elevation of the <br />base is obtained and the degree of lift required for its forma- <br />This elevation is compared to the elevation profile of the <br />and is used to fix the elevation location of the rainfall field. <br /> <br />,-)"", <br />(/',' <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.