Laserfiche WebLink
<br />, ., <br /> <br />. <br /> <br />. <br /> <br />PROJECT SUMMARY <br /> <br />Improvements in the Town's Water System <br />Town of Granby <br /> <br />. July 16, 1992 <br /> <br />A brief engineering report, attached to this Project Summary. clearly <br />, describes each of the improvements to be made to the Town's water system. The <br />need for each improvement is also explained and cost estimates are provided <br />for each comi>onent to bl;! constructed.; <br /> <br />;,;" ,,,)~;..,' PROJECT DESCRIPTION- . <br />~?~("t .. , .......: ..... ..... '.. .;...".'__~;:_'..' _.>::'~""J' ;; <br />,;{~., ,.. ..~;::.: Improve~ents ;tci;th~"'~~te'~' treatmentprgce~s;:; in~T~d~": th~ee'''ri~wback~~h;''porid; .,,~"";?t: <br />."::~'.:~,~r>~;o:;~~:~'~, ~ .:.........R,tal\.ln.u'".v.o:_....-u...~C'r a..........I_.~~~e-,:::^..........;I __lp"v....k...,. an.d <:.:....,. <br />..a new 12-inch bypass line running from the .intake,structure directly to the... <br />:;;i:' ;e,c', . water treatment plant.~I!-'",---~~-~__, a weU,2,4-,:;'; <br />~~.iZ~.~":'; house, and:chl9.rin~tioJ1:f~cnities .~;A)2~i.~l::h;~ater,;Hne 'approi"i'iDUely 1750;,fr~t <br />..~,ik~...t':;: feet 1 n 1 ength win-be. constructed from the water,;treatment pl ant to the south:'1.'~~q~; <br />m"""~~",~"'" side of the Fraser'River ,~', ",.",....'..J ,C',"'d.U.;,,,;,,,.,c,,,,,':t'F..."h.,," .,.,;.", ";."'1i".~;"."". <br />~:$~~:~ " '-'1 "~.~ -: .. "..'r;1i;~.~t.i~:,"'>";'~~-'::"""f~_:::~':':'~"!;-;:;;'~~~~~f~/"'~1f:~:;f;;/;'-'-~.'" '.;~/~~~~~~t? <br /> <br />.; <br /> <br /> <br />PROJECT NEED <br /> <br />- <br />The improvements to the water.treatment process are needed because of taste <br />and odor problems. The new intake structure is needed in order to avoid, <br />during periods every year, temporary modifications to a downstream diversion <br />dam (required.to maintain the proper water surface level at the intake <br />structure), The new well field is needed to provide a backup source of water <br />supply in the event of temporary water quality problems on the Fraser River, <br />the primary water source. The new water line to the south side of the Fraser <br />River is needed to serve a subdivision which is presently obtaining permits <br />for construction. <br /> <br />TECHNICAL FEASIBILITY <br /> <br />The technical aspects of each project component are discussed in the <br />engineering report. <br /> <br />PROJECT COSTS, AND FINANCIAL PLAN <br /> <br />The following costs are summarized from the engineering report. <br /> <br />Intake Structure and Bypass <br />Backwash Ponds <br />We 11 Fi e 1 d <br />Water Line Extension <br /> <br />$41,100 <br />$148,500 <br />$180,400 <br />$102,400 <br /> <br />Estimated Construction Cost <br /> <br />$472,400 <br /> <br />The Town will finance the project through a loan of $400,000 from the Colorado <br />Water Resources and Power Development Authority. The balance of the funds <br />needed will be provided from cash on hand. <br />