<br />PROJECT SUMMARY
<br />
<br />Improvements in the Town's Water System
<br />Town of Granby
<br />
<br />. July 16, 1992
<br />
<br />A brief engineering report, attached to this Project Summary. clearly
<br />, describes each of the improvements to be made to the Town's water system. The
<br />need for each improvement is also explained and cost estimates are provided
<br />for each comi>onent to bl;! constructed.;
<br />
<br />;,;" ,,,)~;..,' PROJECT DESCRIPTION- .
<br />~?~("t .. , .......: ..... ..... '.. .;...".'__~;:_'..' _.>::'~""J' ;;
<br />,;{~., ,.. ..~;::.: Improve~ents ;tci;th~"'~~te'~' treatmentprgce~s;:; in~T~d~": th~ee'''ri~wback~~h;''porid; .,,~"";?t:
<br />."::~'.:~,~r>~;o:;~~:~'~, ~ .:.........R,tal\.ln.u'".v.o:_....-u...~C'r a..........I_.~~~e-,:::^..........;I __lp"v....k...,. an.d <:.:....,.
<br />..a new 12-inch bypass line running from the .intake,structure directly to the...
<br />:;;i:' ;e,c', . water treatment plant.~I!-'",---~~-~__, a weU,2,4-,:;';
<br />~~.iZ~.~":'; house, and:chl9.rin~tioJ1:f~cnities .~;A)2~i.~l::h;~ater,;Hne 'approi"i'iDUely 1750;,fr~t
<br />..~,ik~...t':;: feet 1 n 1 ength win-be. constructed from the water,;treatment pl ant to the south:'1.'~~q~;
<br />m"""~~",~"'" side of the Fraser'River ,~', ",.",....'..J ,C',"'d.U.;,,,;,,,.,c,,,,,':t'F..."h.,," .,.,;.", ";."'1i".~;"."".
<br />~:$~~:~ " '-'1 "~.~ -: .. "..'r;1i;~.~t.i~:,"'>";'~~-'::"""f~_:::~':':'~"!;-;:;;'~~~~~f~/"'~1f:~:;f;;/;'-'-~.'" '.;~/~~~~~~t?
<br />
<br />.;
<br />
<br />
<br />PROJECT NEED
<br />
<br />-
<br />The improvements to the water.treatment process are needed because of taste
<br />and odor problems. The new intake structure is needed in order to avoid,
<br />during periods every year, temporary modifications to a downstream diversion
<br />dam (required.to maintain the proper water surface level at the intake
<br />structure), The new well field is needed to provide a backup source of water
<br />supply in the event of temporary water quality problems on the Fraser River,
<br />the primary water source. The new water line to the south side of the Fraser
<br />River is needed to serve a subdivision which is presently obtaining permits
<br />for construction.
<br />
<br />TECHNICAL FEASIBILITY
<br />
<br />The technical aspects of each project component are discussed in the
<br />engineering report.
<br />
<br />PROJECT COSTS, AND FINANCIAL PLAN
<br />
<br />The following costs are summarized from the engineering report.
<br />
<br />Intake Structure and Bypass
<br />Backwash Ponds
<br />We 11 Fi e 1 d
<br />Water Line Extension
<br />
<br />$41,100
<br />$148,500
<br />$180,400
<br />$102,400
<br />
<br />Estimated Construction Cost
<br />
<br />$472,400
<br />
<br />The Town will finance the project through a loan of $400,000 from the Colorado
<br />Water Resources and Power Development Authority. The balance of the funds
<br />needed will be provided from cash on hand.