My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08207
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:56 PM
Creation date
10/5/2006 3:27:53 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Water and Power Authority - Project Summaries
Date
8/4/1992
Prepared For
State of Colorado
Prepared By
CWCB
Floodplain - Doc Type
Projects (non-floodplain)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />June 10, 1992. <br />},tor. Joan Pritchard, Tow'll Man2ger <br />Town of G=by <br />p..o:.ge 6 <br /> <br />I" <br />, <br />, <br />'~.". <br /> <br /> <br />Cost Estimates <br /> <br />; <br />1 <br />! <br />i <br />I <br />i <br />I <br />r <br /> <br />, <br />I <br />I <br />I <br />I <br />1 <br />i <br />, <br />; <br />i <br />! <br /> <br />~n<:"D the well is ~roximatel.y ~ 210 feet deep, we would anticipate that the <br />groundwater would not be influenced by surl'-..ce wata' and would oo.1:y reqcire <br />eblorlnatioD.. The well house would also contain the motor control center (MCC) for the <br />well. pumps, mete."'ing devices, etc. The water would then COlltinue on to the storage <br />facility. Level ttansduc.ers wollld be l~~ in the ~~ facilities. The levd. <br />tIansduc.ers would sense the w-4er level in the stor..ge tmk and send a linear signal to the <br />well house to stlIt and stop pumps, as well as provide alarms. . <br /> <br />j"o;. <br /> <br />- <br />'The physical inftastructure reqcire:d to develop a well fie!d adjac=t to the stora..~ _ <br />f~""';ties arc enclosed. We are l'M lrlng the ass"" -plion that water of acceptable quantity <br />and quality will be aV"..i12ble adja=t to the s-.orage ;;,,,;Hri,,,,. This =not be asc=i:Ded' <br />until sr.e spec'.iic mor.itoring wells arc drilled. For the PUIpOses of the cost estim2ies, <br />we hzve C!SSw:aed that the two wells ..ill be l=ted within 1000 feet of the storage tanks. ' <br />The well house will be l()Mtp,; .a.cj=t to the wells. We are also assuming that tlrree- <br />ph2.se power is 4\"Cili.ble at the stcr2.ge tmJk f~"";,.;p~~ <br /> <br />$=:-::.~t.:::3~~ ~C?;C:~.j ~.~::':..::. J~:C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.