Laserfiche WebLink
<br />j;Ji:.r lO-~( tnU U~.c:~ 1111 vIII vr ulc.rU..lI'tU <br /> <br />rHh I'M ~IU 0<:1 UO~<: <br /> <br />r. U.J <br /> <br />T-jUlLE l1A <br />, ESTIMATED PROJECT COST <br />PAWNEE CREEX FLOOD ~ONTROL IMPROVEMENTS <br />SELECTED PLAN OF IMPROVEMENTS <br /> <br />PAWNEE CREEK OVERFLOW <br />ALT. NO. 1 <br /> <br /> ITEM DESCRIPTION UNIT EST. UNIT TOTAL <br /> QTY. PRICE PRICE <br /> 1 General <br /> Mobilization (Max, 5% ,,(Total Cost) LS 1 SSO,OOO S50,OOO <br /> Troffic Control LS ' I $50,000 S50,000 <br /> 2 StaDda.... Levees (iDcI_des rai$lnl: eN.>> and gravel driveway) <br /> Clearing 8< Grubbing AC 1L3 SSOO S5,650. <br /> Remove and Replace Topsoil CY 18240 $2 $36,430 <br /> Fill ror Levees CY 46124 ,.. 53 $138,372 <br /> Seeding and Revege!lltion AC 11.3 $3,500 S39,550 <br /> Asphall on CR 33 (540' ,,24') SY 1440 SI2 $17,280 <br /> Gravel Replacemenl on hivale Drive CY 360 S15 $5,400 <br /> 3 RiDg Levees <br /> #1 LS I $16.300 S16,300 <br /> #Z LS 1 S9,400 $9,400 <br /> #3 LS I $27.600 $27,600 <br /> 4 lDstall Calvert> @ U.s. ll:lghWIIY 6 Bridge (southbound Iau.. only) , <br /> Remove El<isling Roadway J' SY ISO $4 $600 <br /> Install (4) 8 Fe. x 20 Ft. RCB'S L.F 40 $4.650 $186,000 <br /> Erosion Cootrol (Type H RJpmp) TN 275 S35 $9,625 <br /> Extend :existing Siphon SlIuClure LS I $20.000 $20,000 <br /> 5 Replace '11,5. Higbway 6 Bridge (Northbound) by CDOT <br /> Remove Exlsling Roadway SY 750 . 54 $3,000 <br /> New Bridge (207' Jl 38') SF 7866 $70 $550.620 <br /> Erosion Control (Type H Riprap) TN 345 $35 512,075 <br /> 6 Replaeemenl or Ul'RR Bridge <br /> By upn LS $378,000 $378,000 <br /> 7 Drop StruClne <br /> Concrete Cut.otfWall LS I $35,000 $35.000 <br />! Type M Riprap TN 105 S30 $3,150 <br /> Type H Riprap TN 525 $30 $15.750 <br /> 8 Channel ImprovemelllS DOWDstream ofUPRR <br /> Conciete Flood Wall (l'Ionh Bank) CY 190 $500 595.000 <br /> Excavation for Channel CY 9160 $3 $21.480 <br /> S...ding and Ravellew!on AC 0.2 $3,499 $700 <br /> son Cemonl under UPIUl CY 750 $20 515.000 <br /> !l Sprlllgdale Ditch Illlp..........AIO <br /> 6o.incb ReI' With Flap Gate LS 517,500 SI7,500 <br /> subtotal $1,765,532 <br />~ <br /> IS% CoAtl.egency $264,830 <br /> To",' Coas.....etlon Cost $2,030,362 <br /> Engineering CDS" (12%) $243,643 <br /> Legal. Fiscal 8< AdminiStration (5%) $101,518 <br /> Land Acquisition AC 11.3 $2,500 $28,250 <br /> Flow Easement At; 15 $100 $1.500 <br /> Tolal :Project em $2,405,273 <br /> Total :Project Cm I... ite", 5 an 51,135,531 <br /> 44 <br />