My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08206
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:56 PM
Creation date
10/5/2006 3:27:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Stream Name
All
Basin
Statewide
Title
Colorado State Hazard Mitigation Grant Program
Date
9/1/1997
Prepared For
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO <br />State Hazard Mitigation Grant Program <br /> <br />Notice of Interest (NOI) <br /> <br />DISASTER NUMBER: DR-1186 <br /> <br />PLEASE RETURN NO LATER THAN: <br /> <br />September 22, 1997 <br /> <br />Project Designation: <br /> <br />SHORTLINE REGIONAL STORMWATER FACILITIES <br /> <br />Date Submitted: <br /> <br />September 22, 1997 <br /> <br />AlJDlication Information <br /> <br />A. Name of Applicant / Jurisdiction: CITY OF FORT LUPTON. COLORADO <br />B. Type: Government, Private, Non-Profit, etc.) Government <br />C. Point of Contact (Applicant or Agent) for the proposed measure or project: <br /> <br />1. Name: Mr. Dean Garcia. P.E.. c/o Black & Veach EDI!ineerinl! <br />2, Title: City Enl!ineer (Consultant) <br />3. Address: 11900 E. Cornell Ave. : Suite 300. Aurora. Colorado. 80014 <br />4. Business Phone: (AlC): (303) 671-4200 Fa,,: (AlC) (303) 671-4285 <br /> <br />D, Location and Description of Project: ADDroximatelv 3/4 mile east of Denver Avenue from Colorado <br />Hwv. 52 north to Weld Co. Road /4. then west to S. Platte River. Ooen channel tlrainat!ewav. street <br />crossin(f. retrional detention Dond, diversion and control structures and related aDDurtenances. <br /> <br />E. Estimate of Cost: <br /> <br />Phase I: $400,000 <br /> <br />Total Proiect: $850.000 <br /> <br />F, Briefly describe the problem to be solved~ <br />Historic and develoDed storm IWws couDled with arzricultural dewatenn(f and new (folf course <br />runoff have accelerated the need for this ret!ional faciliiv to mitieate localized tloodin(f and <br />DrODertv losses west of the ShortIine CanaL <br /> <br />G. Describe how often this problem occurs: Reeular ditch breachin(f and downstream tloodint! with 5- <br />vear and successivelv more intense storm events occur 2-3 times annualIv. <br /> <br />H. When could the project be completed? Phase 1- March 1999 <br /> <br />Total Proiect: November. 2000 <br /> <br />RETURN TO: Fred Sibley. State Hazard Mitigation Officer <br />c/o Office of Emergency Management <br />15070 South Golden Road <br />Golden, CO 80401-3879 <br />(303) 273-1775....,FAX: (303) 273-1755 <br />
The URL can be used to link to this page
Your browser does not support the video tag.