Laserfiche WebLink
<br />TfBLE llA <br />, ESTlMA TED PROJ:Ecr COST <br />PAWNEE CREEK FLOOD ~ONTROL IMPROVEMENTS <br />SELECI1:D PLAl"! OF IMPROVEME:'ITS <br /> <br />DESCRU'TION <br /> <br />ITEM <br /> <br />UNIT EST. <br />QTY, <br /> <br />l?AWNEE CREEK OVERFLOW <br />, ALT. NO. 1 <br /> <br />UNIT <br />PRICE <br /> <br />TOTAL <br />PRICE <br /> <br />. <br /> <br />1 <br /> <br />General <br />Mobilization (Max, 5% a!Toml Cost) LS <br />Traffio ContTal LS <br />StAndard Levees (includes rai$inl: CR:J3 and gravel driveway) <br />Clearing & Grubbins' AC <br />Remove and Replaoe Topsoil CY <br />Fill far Levees cy <br />Seeding and Revegd:llion AC <br />Asphalt on CR 33 (540' "24') SY <br />Gravel Replacement on Priv>te Drive cy <br />Ring Leve.. <br />~ U <br />~ u <br />n u <br />Install Culverts@ U.s, Highway' Bridge (southbound lao.. oilly) <br />Remove Existing Roadway -,-. SY <br />Install (4) SF, x20 Ft. RCB'S LF <br />Erosion Contral (Type H RJpl1lp) TN <br />Extend Existing Siphon Structure U <br />Replace U,S. Highway 6 Bridge (Narthbannd) by CDOT <br />RemOve IWsting Roadway Sy <br />New Bridge (207' >t38') SF <br />Erosion Cantrol (Type H Riprap) TN <br />Replacement of tll'RR Bridge <br />By UPAA LS <br />l>top Struoture <br />Conerete Cut,affWall U <br />Type M RJprap TN <br />Type H Riprap TN <br />Channellmprovements Down_Ill o(WRR <br />Concr=te Flood Wall (North Banlc) cy <br />Excavstion for Channel CY <br />Seeding I\Dd ~eeel8tion AC <br />Soil Com""t Wldc:r UPAA CY <br />Sprillgda'o Ditch IDlpnMIDlools <br />60.inch RCP Wuh Flap Gate 15 <br /> <br />2 <br /> <br />3 <br /> <br />4 <br /> <br />IS <br /> <br />6 <br /> <br />7 <br /> <br />8 <br /> <br />!l <br /> <br />11.3 <br />18240 <br />46124 <br />11.3 <br />1440 <br />360 <br /> <br />ISO <br />40 <br />275 <br />J <br /> <br />750. <br />7866 <br />345 <br /> <br />I <br />105 <br />525 <br /> <br />190 <br />1160 <br />0.2 <br />750 <br /> <br />1 <br />I <br /> <br />550,000 <br />5S0,OQO <br /> <br />SSOO <br />52 <br />$3 <br />$3,500 <br />512 <br />$15 <br /> <br />I <br />1 <br />1 <br /> <br />$16.300 <br />59.400 <br />527,600 <br /> <br />$.I <br />$.1,650 <br />S35 <br />520,000 <br /> <br />$.I <br />570 <br />535 <br /> <br />$378,000 <br /> <br />$35,000 <br />S30 <br />S30 <br /> <br />S500 <br />S3 <br />$3,499 <br />S20 <br /> <br />S17 ,500 <br />subtotal <br /> <br />15"0 Coadugency <br />Total Coosl.....tiOD Cost <br /> <br />Eoginocring C05l$ (12"10) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition <br />Flow Easement <br /> <br />AC <br />AC <br /> <br />11.3 <br />IS <br /> <br />S2,500 <br />SIOO <br /> <br />T olall'roJ.ct Cost <br />Totsll>ro}..! Cost less it.... 5 aD <br /> <br />44 <br /> <br />S50,OOO <br />S50,OOO <br /> <br />$5,650, <br />$36,480 <br />S138,372 <br />$39.550 <br />$17.280 <br />$5.400 <br /> <br />516,300 <br />S9,400 <br />$27,600 <br /> <br />$600 <br />S 186,000 <br />$9,625 <br />$20.000 <br /> <br />$3,000 <br />$550,620 <br />$12.075 <br /> <br />5378,000 <br /> <br />$35,000 <br />$3,150 <br />$15.750 <br /> <br />$95,000 <br />$27,480 <br />$700 <br />$15,000 <br /> <br />$17.500 <br />$1,765,532 <br /> <br />$264,830 <br />$2,030,362 <br /> <br />$243,643 <br />$101,518 <br />$28,250 <br />51.500 <br /> <br />S2,405,273 <br />$1.135,531 <br />