Laserfiche WebLink
<br />Item Unit Unit Coet Quantity Total Cost <br />1. General <br />Mobilization LS $50.000 1 $50.000 <br />Traffic Control LS $50,000 1 $50,000 <br />2. S18ndard Levees (includ.... raislng CR33) <br />Clearing and grubbing AC $500 6 $3,000 <br />Remove and replace IOpsoil CV $2 10900 $21,800 <br />Fill fot levees Cy $3 27675 $83,025 <br />Seeding aM revegetatiOn AC $3,50\) 11.3 $39,550 <br />Levee protection lS $17,000 1 $17,000 <br />Gravel replacement on private drive Cy $15 360 $5,400 <br />3. Ring levee:s <br />No,' LS $16.300 1 $16,300 <br />No.2 LS $9,400 1 $9,400 <br />No.3 LS $27,600 1 $27,600 <br />4. Install Culverts @ U.S. Hwy 6 Bridge (SB) <br />Remove ..xislin9 roadway SY , $~ 150 $600 <br />JnSleU (4) 8' x 20' RCB'. LF $4,650 40 $166,000 <br />Erosion Control (Typ<:l H riprap) TN $35 275 $9,625 <br />Ext..nd el<lstlng Sip"on stnJcture LS $20,000 1 $20.000 <br />6. Replace U,S, Hwy 6 Bridge (HB by COOT) <br />Remove existing roa<may SY $4 750 $3,000 <br />New bridge (207' x 36~ SF $70 7866 $550,620 <br />Erosion control (Type H Iip~) TN $3$ 345 $12,075 <br />6. Fleplacement of UPRR Brldge <br />l3y UPRR LS $378,000 1 $378.000 <br />7. Drop structure <br />Concr~ta cut-off wall LS $35,000 1 $35,000 <br />TypeMriptap TN $30 105 $3,150 <br />Type H rtprap TN $30 525 $15,750 <br />8, Chennallmprovenwlflt DOwnstteam 01 UPRPI <br />Concrete flood waU (north bank) CV $5OQ 190 $95,000 <br />ExcavaUon for cMonel CY $3 9160 $27,480 <br />Seeding and ,.."egetation AC $3,500 0.2 $700 <br />Soil comen! under UPRR CY $20 750 $15,000 <br />9, springdale 0iIch lmproWlllants <br />eO-Inch RCP WIth flap gate L$ $17,500 1 $17,500 <br /> Subtotal $1,692,575 <br /> t 5% Contingency $253.886 <br /> Talal Con$tructton CCl$t $1,846,461 <br /> engineering Design (10%) $1 94,646 <br /> Legal, fiseal, & AdIlIlnlstration (5%) $97,323 <br /> land Acquismon 528.000 <br /> Flow Easement $1,500 <br /> Total Project Cost $2.267,930 <br /> Project Coat Breakdown: <br /> UPRR $434,700 <br /> COOT $6$0,549 <br /> Other Project Sponsors $1,182,681 <br /> <br />Pawnee Creek Flood Control Improvements <br />Logan County, Colorado <br />Modified Plan of Improvements <br />Estimated Project eost: september 1997 <br />