My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08206
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:56 PM
Creation date
10/5/2006 3:27:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Stream Name
All
Basin
Statewide
Title
Colorado State Hazard Mitigation Grant Program
Date
9/1/1997
Prepared For
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COMMUNITY OF WELDONA <br />MORGAN COUNTY, COLORADO <br /> <br />Conceptual Flood Hazard Mitigation Alternatives <br /> <br />The basic flood hazard mitigation opportunities that exist are presented in the following table, <br /> <br /> <br />Relocate Weidona $3,000;000 Low <br />Fioodproof or elevate structures $1,000,000 High <br />Structural Flood Control $ 600,000 High <br />Measures <br />Do nothing $0 Low <br /> <br />The cost estimates shown above are very preliminary and should be used for comparison purposes only, <br />Detailed cost estimates should be established prior to selection and implementation of the desired <br />mitigation alternative, On behalf of Morgan County, the CWCS is developing conceptual design plans for <br />the "Structural Flood Control Measures" aiternative. The structural alternative may consist of the following <br />features: <br /> <br />. Improve capacity of existing drainage channel that runs parallel to the railroad embankment. <br /> <br />. Construct new drainage channel from Highway 144 to the South Platte River along CR 9 (R.O.W) <br />acquisition will be required), <br /> <br />. Remove existing undersized culverts at several locations and replace with larger culverts. Add <br />new culverts at two locations to increase flow capacity. <br /> <br />. Construct a flow channel along Warren Street by lowering the street, inverting the crown, and <br />paving the street surface. <br /> <br />. Construct a ring levee to protect the school buildings. <br /> <br />. Construct a diversion dike to direct upstream flows to the Warren Street flow channel. <br /> <br />. Raise the elevation of two roadways and provide culverts to the improved drainage ditch, <br /> <br />. Remove the existing railroad trestle bridge (east of Weldon a). <br />
The URL can be used to link to this page
Your browser does not support the video tag.