My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08183
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:52 PM
Creation date
10/5/2006 3:26:45 AM
Metadata
Fields
Template:
Floodplain Documents
County
Summit
Community
Breckenridge
Stream Name
Blue River
Basin
Colorado Mainstem
Title
Floodplain Information Breckenridge
Date
9/1/1974
Prepared For
Summit County
Prepared By
Leonard Rice Consulting Water Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />I <br />~ <br />( <br /> <br />APPENDIX A <br /> <br />? <br /> <br />FLOOD PLAIN INFORMATION REPORT <br />FOR <br />BLUE RIVER, VICINITY OF BRECKENRIDGE, COLORADO <br /> <br />~ <br /> <br />1. Scope of Work. - The work to be accomplished under this <br />contract consists of the preparation of a report that delineates <br />the Intermediate Regional Flood (IRF) and the Standard Project <br />Flood (SPF) flood plains in the vicinity of Breckenridge, Colorado, <br />presents the flows for the Blue River downstream from Breckenridge, <br />and provides engineering guidance for road and street crossings. <br /> <br />2. Study Areas. - The areas to be studied and reported on are the <br />following: <br /> <br />a. Flood Plain Delineation. - The Blue River flood plain in <br />the reach shown on the attached map. <br /> <br />~ <br /> <br />b. Peak Discharqes. - Peak discharges for the Blue River <br />should be developed and presented in tabular form for the 10 and <br />25 year floods, the IRF, and the SPF just downstream of Goose <br />Pasture Tarn Reservoir. The same information should be tabulated <br />for points on the Blue River immediately upstream from Dillon <br />Reservoir and immediately downstream from ,the following points: <br />Illinois Gulch, Lehman Gulch, Sawmill Gulch, French Creek, North <br />Barton Gulch, and Swan River. <br /> <br />~ <br /> <br />3. Conferences. - During the progress of the work, the engineer <br />shall confer with representatives of the Town of Breckenridge, the <br />County of Summit, and the Colorado Water Conservation Board as <br />necessary to assure that the completed report shall meet their <br />approval. <br /> <br />i <br /> <br />4. General Requirements. - The town and county shall arrange for <br />right-of-entry with property owners to conduct field surveys and <br />investigations. <br /> <br />, 5. <br />, <br />~ of <br />, <br /> <br />Furnished Material. - A high-quality, reproducible contour map <br />the reach to be delineated. <br /> <br />6. Work Items. - <br /> <br />a. Field Investiqations. <br /> <br />~' <br />. <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.