Laserfiche WebLink
<br />SOMA-2 <br /> <br />FINAL SUMMARY OF MAP ACTIONS <br /> <br />Community: BOULDER COUNTY · <br /> <br />Community No.: 080023 <br /> <br />To assist your community in maintaining the Flood Insurance Rate Map (FIRM),we have summarized <br />below the previous Letter of Map Change (LOMe) actions (i.e., Letters of Map Revision (LOMRs) <br />and Letters of Map Ammendment (LOMAs)) that will be affected when the revised FIRM becomes <br />effective on 10/04/2002. <br /> <br />1. LOMRs and LOMAs Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will be reflected on the revised <br />FIRM. However, these LOMRs and LOMAs will remain in effect until the revised FIRM becomes <br />effective. <br /> <br /> Date Old New <br />LOMC Case No. Issued Project Identifier Panel Panel <br /> fRAILI OB013C0576G <br />102 96.QB-301 P 09/06/1996 OB013C0576H <br /> PEDESTRIAN TRAIL UNDER BNRR BRIDGE <br />102 96.08-301 P 09/06/1996 OB013C0560F OB013C0557G <br /> <br />2. LOMRs and LOMAs Not Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the revised <br />FIRM because of scale limitations or because the LOMR or LaMA issued had determined that the <br />lot(s) or structure(s) involved were outside the Special Flood Hazard Area, as shown on the FIRM. <br />These LOMRs and LOMAs will remain in effect until the revised FIRM becomes effective. These <br />LOMRs and LOMAs will be revalidated free of charge I day after the revised FIRM becomes effective <br />through a single letter that reaffirms the validity of the previous LOMC. <br /> <br /> Date Old New <br />LOMC Case No. Issued Projeot Identifier Panel Panel <br />LOMA 97-08-166A 04/22/1997 GREENBELT MEADOWS, LOT 87 - 66 MINEOLA OB013C0555F OB013C0555G <br />COURT <br /> <br />3. LOMRs and LOMAs Superseded <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the final <br />revised FIRM because they are being superseded by new detailed flood hazard information or the infor- <br />mation available was not sufficient to make a determination. The reason each is being superseded is <br />noted below. These LOMRs and LOMAs will no longer be in effect when the revised FIRM becomes <br />effective. <br /> <br />03/27/02 <br /> <br />Page 1012 <br />