My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08157
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:48 PM
Creation date
10/5/2006 3:25:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Broomfield
Community
Broomfield
Stream Name
Nissen Reservoir No. 2 Downstream Channel
Basin
South Platte
Title
LOMR - Affected Panel 085073 0220 D - Case No. 93-08-157P
Date
1/25/1994
Prepared For
Broomfield
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />, <br />! <br />'( <br />I' 3 <br /> <br />It must be emphasized that all of the standards specified in Section 60.3(d) <br />of the NFIP regulations must be enacted in a legally enforceable document. <br />This includes adoption of the effective FIRM, Floodplain Boundary and <br />Floodway Map, and FIS report to which regulations apply and the modifications <br />made by this LOMR. Some of the standards should already have been enacted by <br />your community. Any additional requirements can be met by taking one of the <br />following actions: <br /> <br />1. Amending existing regulations to incorporate any additional <br />requirements of Section 60.3(d); <br /> <br />2. Adopting all of the standards of Section 60.3(d) into one new, <br />comprehensive set of regulations; or <br /> <br />3. Showing evidence that regulations have previously been adopted that <br />meet or exceed the minimum requirements of Section 60.3(d). <br /> <br />communities that fail to enact the necessary floodplain <br />regulations will be suspended from participation in the NFIP and <br />the prohibitions contained in Section 202(a) of the Act as amended. <br /> <br />management <br />subject to <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your <br />community with any difficulties you may be encountering in enacting the <br />floodplain management regulations. The CCO will be the primary liaison. <br />between your community and FEMA. For information concerning your CCO, please <br />contact: <br /> <br />Mr. Douglas A. Gore <br />Division Director, Mitigation Division <br />Federal Emergency Management Agency <br />Denver Federal Center, Building 710 <br />Box 25267 <br />Denver, Colorado 80225-0267 <br /> <br />The map as listed above and as revised by this letter will be used for all <br />flood insurance policies and renewals issued for your community. <br /> <br />Any questions may be directed to your CCO. <br /> <br />Sincerely, <br /> <br />~'f11.~ <br /> <br />_~n Michael K. Buckley, P.E., Chief <br />vrv-Hazard Identification Branch <br />Mitigation Directorate <br /> <br />Enclosure <br /> <br />cc: Mr. Tim Doherty <br />Civil Engineer, City of Broomfield <br /> <br />Mr. Charles A. McKnight, P.E. <br />Sellards and Grigg, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.