My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08154
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:48 PM
Creation date
10/5/2006 3:25:51 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Westminster
Stream Name
Big Dry Creek
Basin
South Platte
Title
Master Drainageway Planning Study
Date
3/1/1973
Prepared For
Westminster
Prepared By
UDFCD
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-3 <br /> <br />agricultural In nature. If present growth trends cont Inue and develop- <br />ment plans by land owners proceed, a fairly significant portion of the <br />drainage basin will be urbanized by i990. As Is so often the case, <br />development will occur In the lower lying areas aJong Big Dry Creek, <br />and if flood plain regulations are not instituted at an early date, <br />Hetropol itan Denver wi I 1 be faced with a large correct ive cost in the <br />future. BIg Dry Creek offers the best opportunity in the Denver metro- <br />pol Itan area for wise flood plain management. <br /> <br />The large drainage bas in of 86 square mi les sets the stage for very <br />large flood peaks, larger than those normally encountered on tributaries <br />selected for urban drainage planning. This magnitude of potential flood <br />peaks provides a new dimension In the Denver area for flood piain manage- <br />ment work. In essence, channelization costs are unusually high because <br />of the potential flood flow magnitude, and bridgE' and culvert opening <br />requirements are great unless reasonable and prudent ponding and street <br />overtopping are permitted during the desIgn flood" <br /> <br />PHASE A CONCLUSIONS <br /> <br />The analysis and study of alternative solutions for the master planning <br />of Big Dry Creek, when reviewed by DIstrict and :ocal representatives, laid <br />the ground work for the selection of a "non-struc:tural" approach to flood <br />plain management for this channel. In essence, It was concluded that the <br />100-year flood under future developed GOnditions (except for that area in <br />the vicinity of Rocky Flats) would be used as a design basis for all <br />planning and that the flood pialn definition for zoning method would be <br />used to safeguard the governmental entities and future citizens from <br />unusual flood hazard and losses along Big Dry Cn,ek, <br /> <br />GENERAL <br /> <br />This report Is presented In two volumoes. Volume I contains the written <br />text and exhibits to provide a background and thE' overall ,'ecommendatIons, <br />Volume II presents the detai led plan and profi Ie sheets for' Big Dry Creek. <br />The I ength of channe I wh I ch has been stud i 'ad and for wh I ch master pI ann i ng <br />has been prepared is 21 miles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.