<br />v 11-6 <br /> <br />The channel below the Calkins Ditch hE'ildgate sho~ln on Sheet 15 needs <br />the addition of large rock dlsslpators to break up the jet that could <br />cause considerable erosional damagE dO~lnstream of the headgate, even for <br />frequently occurring storms. Due to urbanl.zatlon, the, low frequency <br />storms wi 1 I have much greater runoff peaks ,and vo I umes and the rate of <br />erosion downstream of the Calkins Ditch heCidgate ,,,Ill be considerabiy <br />accelerated. <br /> <br />The existing 112th Avenue bridge is to be replaced with a brIdge 75 <br />feet wide, and as In the case with all other brIdges within the area, the <br />low point of the roadway Is not to be locat.ed over' the bridge. The purpose <br />of th Is requ I rement I s to cause washouts to be loc,ated In the road embank- <br />ment so that structural damage to the bridge is minImized, even though <br />the bridge Itself may also be somewhat overtopped. The Sheridan Boulevard <br />embankment shown on Sheet 22 poses a hazard to life and property in the <br />event that It Is washed out. There are presently two culverts nine feet <br />In diameter through the embankment, and they do nclt have sufficient capa- <br />city to pass the des Ign flood of 8800 c1's, The lrnpnlvements proposed <br />Incl ude: <br /> <br />I. RaisIng the embankment to elevation 5261.5. The low poInt is to be <br />located on the south side of the flood plain 50 that erosional damage <br />Is limited to an area that wi I 1 not cause a sudden relMse of a large <br />volume of water. The downstream face of the ,embankment Is to be pro- <br />tected with burled broken concrete or the reg'.t1ar dumped rock rlprap. <br /> <br />2. Two new 10' x 17' box culverts are to bEl added at a substantially <br />higher elevation than the two existing culverts. The purpose of this <br />Is to allow pedestrian passage and to allow for construction of the new <br />facilities without closing all of Sheridan to automobilE, and truck <br />traffic. <br /> <br />3. Both the new box cu I verts and the ex 1st i ng 9-f,oot oct I ameter pipe are to <br />have head walls, wing walls, and an entrance suitable to provIde an <br />entrance coefficient equal to 0.2 or less. Data are available In <br />Federal Highway Administration Hydr.;lullc Englneer'lng Circular No. 13 <br />for the design of the entrances. <br /> <br />4. Both the proposed and the existing ';ulverts wi i i ..equlrE' energy <br />dlsslpators. <br /> <br />5. A shallow V-shaped channel or swale Is to be constructed from the new <br />box culverts to the existing channel do~'nstrellJll of Sheridan Boulevard. <br /> <br />The presence of the concrete median barTler On U. S. 36 (Denver- <br />Boulder Turnpike) causes an Increase in the flood ,elev'ltlon of nearly two <br />feet. It Is proposed that 500 feet of the concreto. median barrIer be re- <br />moved and replaced with a post and rai 1 type steel ban"ler and that the <br />