My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08151
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:47 PM
Creation date
10/5/2006 3:25:44 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Cascade Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Cascade Creek, Phase II
Date
8/5/1985
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF OURAY, COLORADO <br />DEBRIS AND FLOOD CONTROl. H1PROVH1ENTS <br />CASCADE CREEK, PHASE II <br /> <br />INVITATION TO BID <br /> <br />The City of Ouray, Colorado, will receive bids for the construction of <br />debris and flood control improvements for Cascade Creek until 2:00 P.I<1., <br />Dayl i ght Savi ng Ti me on the 26th day of August, 198";, at the City Cl erk 0 s <br />office located at City Hall, P.O. Box 468, Ouray, Co'lorado 81427, at which <br />time and place all bids will be publicly opened and read aloud. <br />Contract Documents, including Drawings and Technical Specifications, are <br />on file at the office of Simons, Li & Associates, Inc., 1660 S. Albion Street, <br />Suite 1010, Denver, Colorado 80222 and the City Clerk's office at City Hall. <br />Copies of the Contract Documents may be obtained by depositing $40.00 <br />with the City of Ouray for each set of documents so obtilined. Each such depo- <br />sit will be non-refundable. <br />A certified check or bank draft, payablp. to the order of City of Ouray, <br />negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond <br />executed by the Bidder and an acceptable surety in an amount equal to five <br />percent (5%) of the total Bid shall be submitted with each Bid. <br />Attention is called to the fact that not less than the minimum salaries <br />and wages as set forth in the Contract Documents must be paid on this project, <br />and that the Contractor must ensure that employees and applicants for <br />employment are not discriminated against because of their race, color, reli- <br />gion, sex, or national origin. <br />The Ci ty of Ouray reserves the ri ght to re,j ect any or all B i cis or to <br />waive any informalities in the bidding. <br />Bids may be held by the City of Ouray for a period not to exceed sixty <br />(60) days from the date of the openi ng of Bids for the purpose of revi ewi ng <br />the Bids and investigating the qualifications of Bidders, prior to awarding <br />of the Contract. <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.