My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08151
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:47 PM
Creation date
10/5/2006 3:25:44 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Cascade Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Cascade Creek, Phase II
Date
8/5/1985
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF OURAY, COLORADO <br />DEBRIS AND FLOOD CONTROL IMPROVEMENTS <br />CASCADE CREE K PHASE I I <br /> <br />BID !TEM DESCRIPTIONS, MEASUREMENT AND PAYMENT <br /> <br />Payment shall be made only for those items included in the Proposal. All <br />costs incurred shall comply with the provisions of these Specifications and <br />shall be included in the unit price bid for the associated items in the <br />Proposal. Except as may be otherwise stipu"lated, no material, labor, or <br />equi pment wi 11 be furni shed by City. The basi s of measurement. and payment for <br />each proposal item will be as described below: <br /> <br />Item No. 100 CLEARING AND GRUBBING. No quanitity measurement will be <br />made for any matenals or work requ-ired to complete th-is item in place. This <br />work shall consist of clearing, grubbing, removing, and disposing of all vege- <br />tation and debris within the I imits of the right-of-way and permanent easement <br />areas and such other areas as may be i ndi cated on the Drawi ngs or requi red by <br />the work, except such Objects as are des"ignated to remain or are to be <br />removed in accordance with other sections of these Specifications. This work <br />shall al so include the preservation from injury or defacement of all vegeta- <br />tion and objects designed to remain. <br /> <br />Item No. 101 REMOVAL OF EXISTING CONCRETE FLU~IE. The measurement and <br />payment of this item will be the totar-number~inear feet of eXisting flume <br />required to be removed for construction of the proposed flume measured along <br />the centerl i ne of the fl ume removed. The uni t pri ce bi d per 1 i near foot of <br />removal shall i ncl ude all of the Contractor's costs of whatsoever nature for <br />removing the existing flume. The price bid shall include: excavation; remo- <br />val of surface materials; removing the existing flume; all required transpor- <br />tation of excavated materials; stockpiling the existing flllme on site approved <br />by the Ci ty; protecti on of exi sti ng facil i ties; di sposal of debri s and excess <br />excavated material; and all other related and necessary materials, work, and <br />equipment required to remove the existing flume in accol'c1ance with the <br />Drawings_and Specifications. <br /> <br />Item No. 102 and 103 REMOVE, MODIFY AND REPLACE EXISTING BRIDGES. The <br />measurement for payment of thiSTtem Wffi-oe t.he total-riumber of "liridges <br />removed, modified and replaced. The unit pdce bid pE!r bridge shall include <br />all of the Contractor's costs of whatsoever nature. The price bid shall <br />i ncl ude: removal of exi sti ng bri dge structure; storage; modificati ons as <br />shown in the drawi ngs; construction of concrete beari ng surfaces; any barri ca- <br />des, traffi c control, and detour si gns necessary duri ng constructi on; <br />rebuilding and compacting approach roadways; and all other related and <br />necessary material s, work, and equipment necessary to remove, modify and <br />replace the bridge. <br /> <br />Item No. 104 PROTECTION OF EXISTING STRUCTURES. No quantity measure- <br />ment wlll be made for any materials or work-requTrea-to complete this item in <br />place. The lump sum price bid for this item shall. include all of the <br />Contractor's costs of whatsoever nature. The price bid will include: <br /> <br />1-11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.