My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07970
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:17 PM
Creation date
10/5/2006 3:20:53 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Frederick, Firestone
Stream Name
Tri-town drainageway
Basin
South Platte
Title
Weld County Tri-Area Sanitation District Storm Water Feasibility Study
Date
1/1/2000
Prepared For
Weld County
Prepared By
Sear-Brown Group
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />D. Alternative Evaluation <br /> <br />Summary of Existing Storm Drainagl~ Problems: <br /> <br />As noted earlier in this study, there are currently no significant existing storm <br />water detention facilities in the vicinity of Dacono, Frederick, Evanston, and <br />Firestone. In addition, the Tri,Town Drainageway is currently a small earthen <br />channel with a capacity to convey somewhere between a 2'year and a lO'year <br />existing condition storm event runoff. Storm events greater than the existing <br />channel capacity flow overland through the communities causing flooding of <br />residential homes, businesses, and streets as depicted by the cross hatched areas <br />shown on Figure 5. <br /> <br />The existing drainage facilities capacities from the south side of the Town of <br />Frederick, north to Firestone Lake (Mil avec Lake), as shown on Figure 2 are <br />described in the table below: <br /> <br />Description <br />8th & Main Street 6'H x 8'W RCB <br />Open channel 8th to 1 st Streets <br />1st (WCR 16) 6'H x lO'W RCBC <br />Open channel WCR 16 to WCR 18 <br />WCR 13 6'H x 50'W Bridge <br />WCR 18 6'H x 17SW Bridge <br /> <br />Existing Drainage Facilities Capacities <br /> <br />( <br /> <br /> Capacity in cfs Source <br />, 650 RMC <br />" <br /> 335 RMC <br /> 710 ACE <br /> 660 ACE <br />-- f-- <br /> 1,500 ACE <br /> 750 ACE <br /> <br />- <br />Capacity in cfs = prior to overtopping <br />RMC = Rocky Mountain Consultants <br />ACE = Anderson Consulting Engineers <br />WCR = Weld County Road <br /> <br />Summary of Proposed Storm Drainage Solutions: <br /> <br />Based on the three planning scenarios simulated within the [,25 Corridor Master <br />Drainage Plan Godding Hollo\\' and Tri,To\\'1l Basins SOltih Weld County, those <br />being: <br /> <br />1. Existing condition hydrology with existing facilities, <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.