Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />New Buildings in Zone A <br /> <br />. New, substantially improved or <br />substantially damaged buildings must <br />be protected from damage by the base <br />flood <br /> <br />. Minimum requirement is to elevate to <br />the BFE <br /> <br /> <br />LOMA & LOMR <br /> <br />Frequently Asked Questions <br /> <br />When Can I Expect my LOMA or <br />LOMR? <br />. LOMA - Once all data is received, <br />response within 60 days. <br />. LOMR-F & LOMR - Once all data is <br />received, response within 90. <br /> <br /> <br />LOMA & LOMR <br /> <br />Internet <br /> <br />....................................... <br /> <br />www.fema.gov <br /> <br />..................................... <br /> <br />. Elevation Certificate <br />. MT-1 forms <br />. MT-2 forms <br />. Fee Schedule <br /> <br /> <br />Lowest floor <br /> <br />. The lowest floor of the lowest enclosed area <br />(including basement) <br />. Enclosed areas below BFE can be used as <br />building access, vehicle parking, storage <br />. Walkout basements are still the lowest floor of <br />a building for floodplain management and <br />insurance rating purposes. <br /> <br /> <br />LOMA & LOMR <br /> <br />Frequently Asked Questions <br /> <br />What is the allowable increase in the <br />base flood elevation (BFE)? <br />. Without Floodway - allowable increase <br />is 1.0 foot <br />. With Floodway - allowable increase is <br />0.00 foot <br /> <br /> <br />LOMA & LOMR <br /> <br />Frequently Asked Questions <br /> <br />? <br /> <br />. <br /> <br /> <br />4 <br />