Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />e.) <br /> <br />DETENTIOh .-OND COST ESTIMATES <br /> <br />COSTS: <br />Earthwork:; 5 $Icy <br />Property Acquisition: <br />Residential Unimproved = 10000 $lac <br />Residential Structures = 80000 $Iunit <br /> <br /> Eartt work JUrisdictional Property Lonstrucllon osts <br /> Reach Number and Outlet Acquisition Structures Spillway or Outlet Cost 35% Total 20% Property Total <br /> Pond Description Cut Fill Vin aen. Structure Unimproved Earthwork Canal Repl. Structure Contigency Engineering Acquistion Project <br /> cv cv Ainac ac units ea. ea. Costs <br /> GODDING HOLLOW BASIN <br /> GODDING HOLLOW BASIN <br />9 Basin 37 (Spur) 11100 0 H=14f1 Pipe 5 0 $55.500 $100,000 $7,200 $162,700 $56.945 $219.645 $43,929 $50,000 $313,574 <br />9 Basin 17 (UPRR) 3400 0 No Pipe 10 0 $17.000 $0 $6.800 $23.800 $8,330 $32,130 $6.426 $100.000 $138.556 <br />8 Basin 31 36500 0 No Pipe 17 0 $182.500 $0 $18.800 $201.300 $70.455 $271.755 $54.351 $170,000 $496.106 <br />7 SWY 52 0 0 Exempt RCBs 35 2 $0 $78.500 $0 $78.500 $27.475 $105.975 $21.195 $510.000 $637.170 <br />10 W.rrib @1.25 0 28300 V=140. A=35 RCBs 40 0 $141.500 $100,000 $39.200 $280.700 $98,245 $378.945 $75.789 $400.000 $854,734 <br />5 1-251WCR 18 0 0 Exempt Pipes 58 0 $0 $0 $0 $0 $0 $0 $0 $580,000 $580.000 <br /> TorALS $396.500 $278,500 $72.000 $747,000 $261.450 $1,008.450 $201,690 $1,810,000 $3,020,140 <br /> <br />P:\COWELD01 \SPREADS~mprovcosts.wb3 <br /> <br />11/24/99 <br />