My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07908
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:08 PM
Creation date
10/5/2006 3:17:44 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
260
County
Jefferson
Community
Unincorporated Jefferson County
Basin
South Platte
Title
Major Drainageway Planning - Sanderson Gulch/Weir Gulch Volume I
Date
8/1/1972
Designation Date
12/1/1987
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION VI <br /> <br />SUMMARY OF PHASE A STUDY <br /> <br />PRELIMINARY MEETINGS A~D DATA GATHERING <br /> <br />Preliminary meetings were held with all groups concerned in the <br />master planning contract for Sanderson and Weir Gulches, Th8 <br />meetings provided direction and coordination for the progression <br />of the study. <br /> <br />Separate meetings were held with Denver, Lakewocd and Jefferson <br />County. In Denver, coordination for the project came through <br />the offices of the Wastewater Control Division. All preliminary <br />meetings, however, provided input from engineering, planning, <br />management, parks and recreation and traffic offices. Meetings <br />held with the City of Lakewood, which were handled through <br />the Department of Community Services, also reflected input from <br />engineering, pl..nnin'l, p<lrks and recc",ation and leg<l1. Jefferson <br />County administrative offices were also kept updated on the pro- <br />grcssion of the study. <br /> <br />3. <br /> <br />Field survey information On the three gulches which <br />included topography and channel cross-sect~on com~leted <br />by the City of Denver for the Corps of EngLneers Ln <br />1961. <br /> <br />4. Land status along the gulches. <br /> <br />5. Topography and facilities of the Agricultural Ditch and <br />Reservoir Company. <br /> <br />6. State highway plans at gulch crossings. <br />7. Projected city arterial street plans. <br />8. City of Denver flood plain maps for Sanderson and weir <br />Gulches through Denver. <br />9. Available recorded rainfall and runoff data for the <br />metropolitan area. <br /> <br />10. Subdivision plans which have or will effect the drainage <br />system operation. <br /> <br />The collection of all this information greatly assisted in the <br />progression and completion of the master planning study. <br /> <br />Review and progress meetings were held with the District, Denver, <br />Lakewood and Jefferson County. At these meetings, progress <br />of the study was reported and contract compliance WaS assured, <br /> <br />DEVELOP~1ENT OF ALTERNATIVE PLANS <br /> <br />In addition to the conversa.tions and meetings held witi'. the <br />involved entities, many other organizations were contacted. <br />These included: <br /> <br />With the preliminary hydrologic inv;sti9ation completed, w~ich , <br />included a determination of the des~gn po~nt flows as outl~ned ~n <br />8ection III and an analysis of existing facility capacities. <br />rcviscd flood plains were devised for the s~x storm frequencies <br />undcr study. Knowledgc provided by the flood plains incluO~d <br />.., ,.,~ ~~~ ~n~~h n+ '~"~d~~.n~ fnr each ~tQr~ frA~UAn~y. <br />~p' ...~ ~ ~..'" --..~.. ~+ -"..... ~~_....'.. ~ -, <br /> <br />1. Corps of Engineers. Omaha District. <br />2. Denver Reqional Council of Gover~~nts. <br />3. Foothills Metropolitan Recreation and Parks District. <br />4. City and County of Denver Assessors Office. <br />5. Jefferson County Assessors Office. <br />6. Agricultural Ditch and Reservoir Company. <br />7. Colorado State Highway Commission. <br />8. U. S. GcologicC\l Survey. <br />9. Subdivision Engineers and Planners. <br /> <br />Following the procedures outlined in Calculation Methods Used , <br />for Damagc Potential Analysis in Section IV, the dam~ge potent~al <br />in dollars was determined for each storm occurrence ~nterval. <br /> <br />Alternative plans for eliminating or minimizing the damage <br />potential were next evaluated. The alternatives considercd <br />for possible application included: <br /> <br />The information obtained through contacts and meetings with these <br />organizations in every o~se had some effect on ~he s~~tus of <br />the gulches. Some of the items of data which were collected <br />include the following: <br /> <br />I. Corps of Engineers flood plain studies for portions <br />of Sanderson, No. Sanderson and Weir Gulches. <br /> <br />2. Corps of r:ngin€ers flood plain studies for the South <br />Platte River which reflect the inst411ation of the <br />Chatfield ~nd Mr. Carbon Darns. <br /> <br />-67- <br /> <br />. <br />.. <br /> <br />",.n~~l ."pe 0- ~'.'~.'~g "'~~'" ',p"~ <br />,,~'"....... '".)' ~ ..~~..,~~,. .--..... ~"". <br />Lined or unlined low velocity open channels, <br />Major underground conduits. <br />Channel relocation. <br />High velocity channels. <br />rmoroved or additional detention facilities. <br />Combination of any of the above. <br /> <br />2. <br />3. <br />,. <br />5. <br />6. <br />,. <br /> <br />-68- <br />
The URL can be used to link to this page
Your browser does not support the video tag.