My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07889
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:05 PM
Creation date
10/5/2006 3:16:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Community
Palisade, Grand Junction, Fruita, Mesa County
Basin
Colorado Mainstem
Title
Grand Valley Stormwater Unification Feasibility Prjoect
Date
6/27/2003
Prepared For
Palisade, Grand Junction, Fruita, Mesa County
Prepared By
Grand Junction Drainage District, CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTlONTHREE <br /> <br />Steering Commmee Process <br /> <br />. Financial and Organizational A...peCh of Alternative..... <br />. Legal Aspect, of .-\tlernati,"es. and <br />. Alternative" Analy...is. <br />The..." document-. provide a "road map" of the iterative proce",.., that led 10 the conclu"ion_, and <br />recommendation!'> described below. <br /> <br /> <br />JOIl Sore/HOI DisCIlHe5 Ihe Pro.\ Clnd lOllS ofa Draillllgt' Au/horilY <br />Sleering Commiltl't' .\faring Oil May 22, 2003 <br /> <br />3.4 MEETINGSIPRESENTATIONS <br /> <br />The Sleering Commillec mel monthly from December 2002 through June 2003 to vil.'\\ <br />prc...entation:-. \1y the ('on suit ant team and to di...cu...... the imponant j..."ue.. facmg the Grand Valley. <br />The ,;tormwaler manager... of the IIH' cnwie... and the C'Omultant h.'am panlCipalcd in additional <br />meeting:... before and after tht' Slecflng Comminee meetings n.:-ompression" and <br />"decompre~~ion" Illeeting,,). and the manager" met "eraratel~ to di"cll''' and review each of the <br />Technical .\Iemorandum,," <br /> <br />3.5 CONSENSUS BUILDING FOR ALTERNATIVES <br /> <br />During the "coping pwce,.. for Ihe Steering Cl)mmillee proce"". II \\"a" recognized that it would <br />~c imponanl for the Steering Commitlce (l) arri\-e at "omc Ic\'c1 of con~cn"u,," The "Wrmwater <br />manager~ :l"ked facilitator .\tolly Tayer to dC\-i~c a melhod in which a ((In,,en,,u,, might be <br />formed. gi\cn Ihe: rn)ce".. lime con~trJ.in"'. .\Iolly rroviJt'd the Ste:ering Comnuuce with a <br />con..en.;,u, di..;cu".;,ion pm\.'e.." \\ith a fall~ad; option to a mcta-dccl';J(1n making rule" In e""encc. <br /> <br />URS <br /> <br />. ~<lo.EC'5:'2Z';E022_;:;""':_"'''''',EV"'S,,3 _oo'"s O_P<>O.._~,E-'VF..... "E~"-' ,... "IE;>' ClEo" ~DOC.2".lUl-cJ 3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.