My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07887
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:04 PM
Creation date
10/5/2006 3:16:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Cottonwood Creek
Basin
Arkansas
Title
LOMR - Affected Panel 08041C 0517 F - Case No. 98-08-135P
Date
7/1/1998
Prepared For
Colorado Springs
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information. <br />We also encourage you to prepare a related article for publication in your community's local newspaper. <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFlP maps. <br /> <br />We will not physically revise and republish the FIRM and FlS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and <br />FIS report warrant physical revision and republication in the future, we will incorporate the modifications <br />made by this LOMR at that time. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in the <br />SFHA. If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.S.C. <br />4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, <br />as amended, communities participating in the NFlP are required to adopt and enforce floodplain <br />management regulations that meet or exceed NFIP criteria. These criteria are the minimum requirements <br />and do not supersede any State or local requirements of a more stringent nature. This includes adoption <br />of the effective FIRM and FIS report to which the regulations apply and the modifications described in this <br />LOMR. <br /> <br />FEMA makes flood insurance available in participating commumtles; in addition, we encourage <br />communities to develop their own loss reduction and prevention programs. Our Project Impact initiative, <br />developed by FEMA Director James Lee Witt, seeks to focus the energy of businesses, citizens, and <br />communities in the United States on the importance of reducing their susceptibility to the impact of all <br />natural disasters, including floods, hurricanes, severe storms, earthquakes, and wildfires. Natural hazard <br />mitigation is most effective when it is planned for and implemented at the local level, by the entities who <br />are most knowledgeable of local conditions and whose economic stability and safety are at stake. For your <br />information, we are enclosing a Project Impact Fact Sheet. For additional information on Project Impact, <br />please visit our Web site at www.fema.gov. <br />
The URL can be used to link to this page
Your browser does not support the video tag.