Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Purnose and Scope <br /> <br />This Floodplain Information Report (FIR) was prepared to provide supporting documentation for <br />the approximate tOO-year floodplain boundaries shown on the Coal Creek FHBM, August 15, <br />1975. The FHBM was prepared using approximate floodplain techniques. It was not accompanied <br />by a report detailing its engineering basis or its uses for floodplain management. This FIR provides <br />limited engineering information to fulfill that need. <br /> <br />. Community Response to the CWCB Desilmation and Approval Process <br /> <br />A letter from the CWCB regarding the'Board's proposed action for designation and approval of the <br />FHBM was transmitted to the Town of Coal Creek. The town does not participate in the National <br />Flood Insurance Program and does not have a floodplain management program. Initially their <br />reaction was one of uncertainty about the purposes of the CWCB's proposed action. The CWCB <br />proceeded with the designation unilaterally (Board initiative), but a meeting was held at the town <br />with the Town Board. Town Board members were receptive to the CWCB's proposed actions once <br />the background and purpose of those actions were explained and discussed. <br /> <br />.. <br /> <br />2 <br />