Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Planning sheets of this report. The anticipated limits of <br /> <br /> <br />flooding in the 100-year flood before and after construction <br /> <br /> <br />of improvements are shown on the t1ajor Drainageway Planning <br /> <br /> <br />sheets. In addition, the water surface profile of the 100- <br /> <br /> <br />year flow is illustrated. The principal elements of the <br /> <br /> <br />proposed plan are described in the following table, beginning <br /> <br /> <br />with the most downstream portion of Lakewood Gulch and pro- <br /> <br /> <br />ceeding upstream. <br /> <br />3 <br />