Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />TABLE VI-3 <br /> <br />23 <br /> <br />I <br /> <br />UNIT PRICES USED IN CONSTRUCTION COST ESTIMATES <br />(December 1979) <br /> <br />I <br /> <br />TABLE VI-2 <br /> <br />RIGHT OF WAY ACQUISITION <br />Easement for construction of <br />culverts and maintenance access <br /> <br />I <br /> <br />ANNUAL UNIT COSTS FOR OPERATION AND MAINTENANCE <br /> <br />EARTH WORK <br />Excavation <br />Backfill <br />Open channel <br />Fill <br />Seeding <br />Area grading <br /> <br />(structural) <br />(structural) <br />(excavation) <br />(embankment) <br /> <br />I <br /> <br />Natural grass-lined channel <br /> <br />$1,3S0 per acre of ROW <br /> <br />I <br /> <br />Concrete-lined channel <br /> <br />$ .7S to $1.2S/L.F. <br /> <br />Culverts and pipes <br /> <br />$ 1.00/L.F. <br /> <br />I <br /> <br />Existing channel <br /> <br />$ . 2S/L.F. <br /> <br />CONCRETE WORK (includes forms and <br />reinforcing steel) <br /> <br />Concrete culverts <br />Concrete lining for open channel <br />Low flow concrete channel <br />New bridge <br />Remove and replace curb & gutter <br /> <br />Administrative costs <br /> <br />$SOO to $l,OOO/Reach <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />MISCELLANEOUS ITEMS <br />Erosion control structure (grouted rip-rap) <br />Drop structure (concrete) <br />Rip-rap - grouted <br />placed <br />filter <br />Remove fence <br />Install fence or guardrail <br />Maintenance access road <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Engineering <br />Legal <br />Contingencies <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />$10,000 to $20,000/Acre <br /> <br />$ lS/L.F. <br /> <br />$ 6/C.Y. <br />$ 6/C.Y. <br />$ 3/C.Y. <br />$ 2.S/C.Y. <br />$ 1,000/Acre <br />$ .l/S.Y. <br /> <br />$ 300 to $ 700/L.F. <br /> $ 210/C.Y. <br /> $ lS/L.F. <br /> $ 40/S.F. <br /> $ 1l.7S/L.F. <br /> <br />$ 2,SOO/Ea. <br />$ S,OOO/Ea. <br />$ 90/C.Y. <br />$ 70/C.Y. <br />$ l/L.F. <br />$ a/L.F. <br />$ 1, SOO/Acre <br />$ 14/L.F. <br /> <br />15% of Construction Costs <br />S% of ROW Costs <br />2~% of Construction and <br />ROW Costs <br />