Laserfiche WebLink
<br />.. <br /> <br />, <br />., <br />'C <br /> <br />2 . <br /> <br />The table below indicates the modified BFEs for several locations along the <br /> <br />affected length of Carpenter Creek. <br /> <br />Location <br />Town of Larkspur <br />Approximately 1,600 feet downstream of <br />confluence with Carpenter Creek <br />Approximately 450 feet downstream of <br />confluence with Carpenter Creek <br />Approximately 1,100 feet upstream of <br />confluence with Carpenter Creek <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />6,662 <br />6,674 <br />6,684 <br /> <br />6,662 <br />6,669 <br />6,684 <br /> <br />Unincorporated Areas of <br />Douglas County <br />Approximately 200 feet upstream of <br />confluence with East Plum Creek <br />Approximately 700 feet upstream of <br />confluence with East Plum Creek <br /> <br />6,679 <br />6,679 <br /> <br />6,677 <br /> <br />6,677 <br /> <br />*Nationa1 Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildings and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the community, that the Mitigation Directorate <br /> <br />reconsider the determination. Any request for reconsideration must be based <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day periOd elapses, the <br />