My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07737
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:39 PM
Creation date
10/5/2006 3:10:37 AM
Metadata
Fields
Template:
Floodplain Documents
County
Eagle
Stream Name
Stone Creek
Basin
Colorado Mainstem
Title
Flood Hazard Identification Report - Stone Creek, Eagle County, Colorado
Date
9/1/1986
Prepared For
Eagle County
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />prior interim approval. These regulations supplement Delegation Order <br />No. 0204-108 of the Secretary of Energy, which was published in the <br />Federal Register and became effective on December 14, 1983 (48 FR <br />55664), with respect to the activities of the Deputy Secretary and the <br />Admi ni st rators. <br /> <br />(b) These procedures shall apply to all power and transmi ssion <br />rate adjustment proceedings for the Power Marketing Administrations <br />(PMAs) which are commenced after these regulations become effective or <br />were in process on the effective date of these regulations but for <br />which the FERC had not issued any substantive orders on or before <br />December 14, 1983. These procedures supersede "Procedures for Public <br />Participation in Power and Transmission Rate Adjustments and <br />Extensions for the Alaska, Southeastern, Southwestern and Western Area <br />Power Administrations" pUblished in 45 FR 86983 (December 31,1980), <br />and amended at 46 FR 6864 (January 22, 1981), and 46 FR 25427 (May 7, <br />1981). <br /> <br />(c) Except to the extent deemed appropriate by the Administrator <br />in accordance with applicable law, these procedures do not apply to <br />rates for short term sales of capacity, energy, or transmission <br />servi ce. <br /> <br />Section 903.2 - Definitions. <br /> <br />As used herein - - <br /> <br />(a) "Admi nistrator" means the Admi nistrator of the PMA whose <br />rate is involved in the rate adjustment or anyone acting in such <br />capacity. <br /> <br />(b) "Department" means the Department of Energy, i nc ludi ng PMAs <br />but excluding the Federal Energy Regulatory Commission. <br /> <br />(c) "Deputy Secretary" means the Deputy Secretary of the <br />Department of Energy, or anyone acting in such capacity. <br /> <br />(d) "FERC" means the Federal Energy Regulatory Commission. <br /> <br />(e) "Major rate adjustment" means a rate adjustment other than a <br />minor rate adjustment. <br /> <br />(f) "Mi nor rate adjustment" means a rate adjustment which (1) <br />will produce less than a 1 percent change in the annual revenues of <br />the power system or (2) is for a power system which has either annual <br />sales normally less than 10D million kilowatthours or an installed <br />capacity of less than 20,000 kilowatts. <br /> <br />(g) "Notice" means the statement which informs customers and the <br />general public of Proposed Rates or proposed rate extensions, <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.