Laserfiche WebLink
<br />. Quattro Pro for Windows 5.0 <br />. Word Perfect for Windows 6,0 <br />. Corel Draw <br /> <br />. Hvdrologv/Hvdraulics: HEC 1-6, BOSS HEC-2, HEC-RAS, Hydraulics Graphic <br />Package, UDSWM2-PC, SWMM EXTRAN, CUlIPF-PC, WSPRO, TR-20, <br />UDSEWER, FLOWNET, Gessler Water/Sewer System Analysis, Flowmaster, <br />StormCAD, Hardy Cross Network Analysis (HCNA), DAMBREAK <br /> <br />. Civil/Survev/CADD: Highway Capacity Manual LOS, AutoCAD 13 including the <br />Advanced Modeling Extension (AME), and AutoCAD Development System (ADS), <br />SOFTDESK/DCA Engineering Applications Software including Survey Data <br />CollectionlInputJReduction, Coordinate Geometry, Design, Advanced Design, Digital <br />Terrain Modeling, and Earthworks, GSX, ESP, LFX Graphics and Photogrammetry <br />Tools; Star'Net Least Squares; Star'Net GPS; SDR Link; TerraModel; HIJAAK; <br />Planimetric Mapping, Contouring Process Overview, Coding (TSP); Slope <br />Stabilization Analysis (SLST), Pavement Life Cycle Cost Analysis <br /> <br />. Proiect ManagementJAdministratiof!: Timberline, Microsoft Project Management <br />Microsoft Access; ACT!; Lotus 123, dBase JIl, 20/20, Intergraph MicroStation. <br />Paradox <br /> <br />Survey Equipment: <br /> <br />. Wild TCIOIO 3" Total Station with On-Board Data Collection <br />. Topcon 6" Theodolites with On-Board Distance Meter <br />. Leitz SETJ 3" Total Station with Sokkia SDR 33 Data Collector <br />. Leica NA2002 Digital Level with On-Boanl Data Collection <br />. Topcon Automatic Level <br />. Nikon Automatic Level <br />. Theodolites (3 each) <br />. Portable Cellular Telephones <br /> <br />B, Current Proiects <br /> <br />In the following table, we present a listing of our firm's current projects, project budgets and <br />anticipated completion dates, Please note that we consider this information to be confidential <br />and would request that the reviewing agency tight),y control the decimation of all copies of the <br />submittal. <br /> <br />Current Proiect <br /> <br />Project <br />Budl!et <br /> <br />Percent <br />Completed <br /> <br />Anticipated <br />Completion Date <br /> <br />Arapahoe County <br />South Clinton Street <br /> <br />Jamison Tributary <br /> <br />$ 53,017 <br />$ 40,809 <br /> <br />95% <br />75% <br /> <br />June <br />June <br /> <br />13 <br />