My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07727
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:37 PM
Creation date
10/5/2006 3:10:11 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Arvada
Stream Name
Ralston/Leyden Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
8/1/1977
Prepared For
Arvada
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />1-3 <br /> <br />I <br /> <br />1 <br /> <br />LEYDEN CREEK <br /> <br />TABLE 1-2 <br /> <br />I <br /> <br />1. <br /> <br />A grass-l ined channel from the confluence to the city I imits of <br />Arvada. <br /> <br />BRIDGES TO BE REPLACED OR IMPROVED <br />FOR <br />IMPLEMENTATION OF MASTER PLAN <br /> <br />I <br /> <br />2. <br /> <br />A nonstructural (modified) channel from the city limits of Arvada <br />to State Highway 93. The Croke Canal and the Church Ditch will <br />be provided with new spill structures. <br /> <br />STREAM <br /> <br />LOCATION <br /> <br />r~ <br /> <br />Ralston Creek <br /> <br />Wes t 56th Avenue <br />C & S Ra i I road <br />Ralston Road <br />Lama r Street <br />Noland Street <br />Pierce Street1' <br />State Highway 121 <br />Wadsworth Boulevard <br />Carr Street <br />Garrison Street <br />Brooks Drive <br />Rensselaer Drive <br />61st Avenue <br />Mi 11er Street <br />Oak Street <br />68th Avenue <br />SilMls Street <br />Ward Road" <br />State Highway 93 <br /> <br />I <br /> <br />Table 1-2 I ists the road crossings on Ralston Creek and Leyden Creek which <br />will have new structures under this master plan. <br /> <br />1 <br /> <br />Table 1-3 presents the total construction costs of this master plan, <br /> <br />, ' <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />Leyden Creek <br /> <br />Simms Street <br />72nd Avenue'~ <br />Alkire Street <br />Indiana Street <br />Quaker Street <br />Leyden Road <br />State Highway 93 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />" These structures will be improved; remainder of structures will <br />be replaced, <br /> <br />1 <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.