My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07722
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:36 PM
Creation date
10/5/2006 3:10:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Fort Collins
Stream Name
Dry Creek
Basin
South Platte
Title
Flood Mitigation Feasibility Study - Dry Creek - Contract Number C150080
Date
10/1/2001
Prepared For
CWCB
Prepared By
Board of County Commissioners Larimer County
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />The project partners include Larimer County, the City of Fort Collins, the Larimer-Weld <br />Irrigation Company, the Windsor Reservoir Company, and the CWCB. This is one of the top <br />priority flood control projects in the Fort Collins area. <br /> <br />D. Study Tasks <br /> <br />Study tasks shall consist of all research, contacts, calculations, analyses, and report <br />generation in order to complete a feasibility study entitled "Dry Creek Flood Control Project <br />Feasibility Study" and outlined as follows: <br /> <br />1. Report cover, cover letter, and table of contents <br /> <br />2. Executive summary (no more than 2 pages) <br /> <br />3. Project introduction <br /> <br />4. Study objective <br /> <br />5. Background (Upper, Middle, and Lower Basins) <br /> <br />a, Project goals or objectives <br /> <br />b, Project evolution and previous studies <br /> <br />c. Project partners <br /> <br />d, Basin land use and existing conditions <br /> <br />e, Flood history <br /> <br />f, Socio-economic conditions (census tract, median income information) <br /> <br />6, Technical information (existing conditions base line data) <br /> <br />a, Hydrology <br /> <br />b, Hydraulics <br /> <br />c, Field investigations <br /> <br />d. Reservoir and irrigation system operations <br /> <br />7, Description of Conceptual alternatives <br /> <br />8. Description of Alternatives as required in the CWCB Guidelines for Financial <br />Assistance <br /> <br />9, Description of Selected alternative and preliminary engineering information about the <br />selected alternative. <br /> <br />a, Selected project hydrology, and hydraulics <br /> <br />b. Douglas Reservoir <br /> <br />c, Middle Basin detention sites <br /> <br />d, Larimer-Weld Irrigation Canal <br /> <br />e. Diversion channel <br /> <br />f, Describe operation of outfall system and structure upgrades <br /> <br />g, Describe the operation of the flood warning and control system and related <br />instrumentation <br /> <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.