My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07680
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:28 PM
Creation date
10/5/2006 3:08:45 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Platte
Title
Cost Proposal and Oral Presentation - Sterling
Date
12/4/1995
Prepared For
CWCB
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />SECTION - I <br />SCOPE OF SERVICES <br /> <br />The Scope of Services outlined in this section of the proposal is essentially that provided by CWCB and <br />the City of Sterling. The subject services will be performed taking into consideration the applicable State <br />and federal requirements as outlined in the RFP. <br /> <br />I <br /> <br />1. Provide a review summary and a report for all of the previous relevant smdies. <br /> <br />I <br /> <br />2. <br /> <br />Provide project recommendations and flood mitigation measures for each study basin. <br /> <br />3. Provide project recommendations and flood mitigation measures for a system analysis. <br /> <br />I <br /> <br />4. <br /> <br />I <br /> <br />5. <br /> <br />6. <br /> <br />I <br />I <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Evaluate the "best use" of the Northwestern Detention Pond proposal. <br /> <br />Implement Multi-Objective planning principles in the project formulation phase of the contract. <br /> <br />Consider the incorporation of a trail system into the Tmal project design. <br /> <br />Communicate with the railroads, CDOT, and Logan County regarding project recommendations. <br /> <br />Obtain roadway and railroad grade profiles for use in project recommendations. <br /> <br />Provide the City with the preliminary mapping and survey needs which will be addressed by "Change <br />Order" . <br /> <br />10. <br /> <br />List the project benefits (primary and secondary) for the "selected project" recommendations or <br />combination thereof. <br /> <br />11. <br /> <br />Estimate construction schedules and implementation times for each basin "selected plan-of- <br />improvement" . <br /> <br />12. <br /> <br />Determine the residual lOG-year floodplain for each basin "selected plan-of-improvement". <br /> <br />13. <br /> <br />Prepare conceptual design drawings and feature locations for each basin "selected plan-of- <br />improvementll . <br /> <br />14. Prepare cost estimates for each basin "selected plan-of-improvement". <br /> <br />15. <br /> <br />Prepare a final report using 8'h" x 11" format with half-size 11" x 17" plates. <br /> <br />16. <br /> <br />Provide one set of full-size engineering mylar drawings. <br /> <br />17. <br /> <br />Provide one set of 3.5" computer diskettes containing copies of all study files including reports, <br />spreadsheets. hydraulic models, drawings, and other backup data. <br /> <br />18. <br /> <br />Consider additional professional services by "change order" under the contracted hourly fee schedule. <br /> <br />The proposed work outlined above will achieve the project objectives. However, a refinement of the scope <br />of services and its finalization is needed prior to executing an agreement for the said consulting services. The <br />order in which these tasks will be performed does not necessarily follow the order in which they are listed <br />above. In our plan of approach, detailed in Section - II of this proposal, the tasks will be performed in an <br />order that will achieve project objectives and allows for efficient execution of interdependent work tasks. <br /> <br />I <br /> <br />CITY OF STERLlNGlCWCIl 1 WRC E:\'GI:\l,ERING, IKC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.