My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07680
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:28 PM
Creation date
10/5/2006 3:08:45 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Platte
Title
Cost Proposal and Oral Presentation - Sterling
Date
12/4/1995
Prepared For
CWCB
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION - IV <br />PROJECT FEE ALLOCATION <br /> <br />Our understanding is that the anticipated budget for this project is $50,000. The following is WRC's <br />proposed manpower/fee allocation for preparation of the requested scope-of-services as encompassed in <br />WRC's Project Approach (Section - II of this proposal). Also included is WRC's personnel list and fee <br />schedule which presents the requested billing rates for WRC's personnel. <br /> <br />SECTION - V <br />PROJECT SCHEDULE <br /> <br />The RFP documents identified the City's and CWCB's desire to have this project completed in a 4 to 6 <br />month time period. Included on the following page is WRC's proposed project schedule which results in a <br />document ready for adoption by the City and the CWCB five and one-half months after the notice to <br />proceed. We believe this schedule will provide the necessary time for completion of the said work tasks <br />with additional time allocated to a)inclusion of public participation in the process, b) review time for the <br />City and CWCB of the recommended alternative improvements and draft report document, and c) <br />coordination with the CDOT and railroad representatives. <br /> <br />CITY OF STERLING/CWCB I WRC ENGINEERING, Il\C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.