Laserfiche WebLink
<br />. <br />t' <br /> <br />. <br /> <br />2 <br /> <br />The modifications are shown on the enclosed annotated copies of FIRM Panels 0005 D and 0010 D for <br />the City of Littleton, Colorado. This LOMR hereby revises these panels of the effective FIRM dated <br />September 29, 1989. <br /> <br />. . The following table is a partial listing of existing and modified base flood elevations (BFEs): <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />Approximately 1,000 feet northeast of the intersection <br />of West Bowles Avenue and South Federal Boulevard <br /> <br />None <br /> <br />5,317 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the revised BFEs will be given in the I jttleton Indl:Pendent on or about February 29 <br />and March 7, 1996. A copy of this notification is enclosed. Any request for reconsideration must be <br />based on scientific or technical data. In addition, a notice of changes will be published in the Federal <br />Register. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your cotumunity will serve as a repository for these new data. We encourage you <br />to disseminate the information reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />information. We also encourage you to prepare a related article for publication in your community's local <br />newspaper. This article should describe the assistance that officials of your community will give to <br />interested persons by providing these data and interpreting the NFIP maps. <br /> <br />The revisions are effective as of the date of this letter; however, within 90 days of the second publication <br />, in the Littleton Indl:Pendent, a citizen may request that FEMA reconsider the determination made by this <br />LOMR. Any request fOr reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the determination to modify the BFEs presented <br />in this LOMR may itself be modified. A separate LOMR describing the effects of the revised analysis <br />within the Town of Columbine Valley was issued to that community on the same date as this LOMR. <br /> <br />Due to present funding constraints, we must limit the number of physical map revisions processed. <br />Consequently, we will not republish the FIRM for your community to reflect the modifications described <br />in this LOMR at this time. However, when changes to FIRM Panels 0005 D and 0010 D for your <br />community warrant a physical revision and republication in the future, we will incorporate the <br />modifications described in this LOMR at that time. <br />