Laserfiche WebLink
<br />APPENDICES Page <br />A SENSITIVITY ANALYSIS OF FLOOD DAMAGE DATA A-1 <br /> . Elevation-Frequency Relationships <br /> . Depth-Damage Relationships <br /> . Management Adjustments <br /> . Method of Analysis <br /> . Computational Accuracy <br /> . Sensitivity of FHF and Event at First Floor <br /> . Sensitivity to Skew <br /> . Sensitivity to Structure Type <br /> . Sensitivity to Ratio of Contents <br /> Value to Structure Value <br /> . Sensitivity to Depth-Damage Data Source <br /> . Sensitivity to Management Adjustments <br /> . References <br /> . Figures and Tables for Damage Reduced A-39 <br />B ENGINEER'S COST ESTIMATES B-1 <br /> . Temporary Closures and Exterior Sealants <br /> . Raising Existing Structure <br /> . Small Walls and Levees <br /> . Removing Existing Structure <br /> . Demolition of an Existing Structure <br /> . Restoration of an Existing Site After <br /> Structure Removal <br /> . New Site Preparation for Existing Structure <br />C PREPAREDNESS PLANNING C-1 <br /> . Flood Threat Recognition Methods <br /> . Procedures for Flood Warning <br /> . Evacuation of Persons and Property <br /> . Implementation of Temporary Protective Measures <br /> . Maintenance and Management of Vital Services <br /> . Post-Flood Reoccupation and Recovery <br /> . Applicability of Preparedness Planning <br /> . Cost Information <br /> . References <br />D SPECIAL CONSTRUCTION MEASURES TO MITIGATE FLOOD <br /> LOSSES IN SINGLE FAMILY RESIDENTIAL CONSTRUCTION D-1 <br /> <br />. Measures which Normally Involve No <br />I ncreased I nitial Construction Cost <br />. Measures which Normally Involve <br />Increased Initial Construction Cost <br />. Flood Loss Mitigation Measures that Normally <br />Involve Increased Initial Construction Cost <br />and that have Controversial Aspects <br /> <br />E BIBLIOGRAPHY <br /> <br />E-1 <br />